Planning application 26/61054 · Inchanappa, Ashford, Co. Wicklow · Observations close 5pm, 7 January 2027

What's changing at Inchanappa Phase 1, and how to have your say

Vastbreak Limited has applied to change the permitted Phase 1 housing scheme off the R772 roundabout at Inchanappa. This page explains the changes in plain English, using the application's own drawings and figures, so you can form your own view.

98 ▲ 118homes in Phase 1 (+20%)
25 ▼ 2four-bed homes in the redesigned area (−92%)
120 ▼ 54 m²typical rear garden (−55%)
1,019 m²new stand-alone creche for about 204 children

In 60 seconds

  1. Phase 1 grows from 98 to 118 homes: 71 permitted homes (55 houses and 16 apartments and duplexes) are replaced by 91.
  2. Four-bed homes in the redesigned area fall from 25 to 2, and 36 semi-detached houses become 48 terraced houses and 12 semis.
  3. Typical rear gardens shrink by more than half, from about 120 m² to about 54 m².
  4. A stand-alone creche for about 204 children is added, sized for future phases too.
  5. The estate road is built out to the eastern boundary, towards Phases 3 and 4 of a draft 390-home masterplan.
  6. The 3-storey blocks go from two to three and get longer. Their stone detailing, which tied the design to Inchanappa House, a Protected Structure, was already removed by a separate permission in September 2026 (26/60716).

How to have your say →

Who made this page

Written for polity.ie, an independent, non-partisan civic project, by Peter Love, an Ashford resident who lives beside the Inchanappa lands (the area the County Development Plan calls "SLO 5"). I'm not against new homes here. I want Ashford's character kept, and the people who will live in these homes well served. Facts are sourced and kept separate from opinion, which is marked Our view. Spotted a mistake? Tell me using the questions form and I'll correct it.

Not affiliated with Wicklow County Council or the applicant. Not legal or planning advice. Last updated 27 November 2026.

1Where it is

In short: the site lies between the R772 and the M11, north of Inchanappa House. Phase 1 already has permission and is being built; this application redesigns its southern part.

The site lies north-east of Ashford village, between the R772 and the M11, with Inchanappa House and its outbuildings to the south. Phase 1 already has permission and is under construction. This application changes its southern part.

Aerial view of Ashford showing the applicant's indicative outline of the development between the R772 and the M11
The applicant's aerial view with its "indicative outline" of the development and the viewpoints of its three CGIs (CGI booklet, 3D Design Bureau for Vastbreak Limited; place labels added). The outline is indicative and doesn't match the site boundary on the applicant's Site Location Map (on the ePlanning file).
Map of Ashford showing the approximate area of the application site between the R772 and the M11, north of Inchanappa House
The approximate area of the application site, between the R772 and the M11 and north of Inchanappa House. For the exact boundary, see the applicant's Site Location Map (BBA Architects drawing G-123-PL-SL-0001) on the Council's ePlanning file. The red line covers the whole Phase 1 site, including the woodland park; this application changes its southern part. Map © OpenStreetMap contributors; labels and outline added.

2Where this phase sits in the draft masterplan

In short: a draft masterplan shows 390 homes over four phases, all reached from the R772 roundabout, with land zoned for active open space (sport and recreation) at the southern end. Only the redesign of the permitted scheme's southern part is being decided now.

The permitted scheme of 98 homes is the first part of a larger landholding. A draft masterplan lodged with the application shows four phases and 390 homes in all.

A note on names. On this page, "Phase 1" means the whole permitted scheme of 98 homes. The masterplan splits it in two: it calls the northern part, which is kept, "Phase 1", and the southern part being redesigned by this application "Phase 2". So the masterplan's "Phase 2" is not new land; it is the part of Phase 1 that this application changes.

Draft Inchanappa masterplan showing four phases, the Active Open Space zoning to the south and a single access from the R772
  1. One vehicle access for the whole site, from the R772 roundabout.
  2. The road in the redesigned area (the masterplan's "Phase 2", this application) continues into Phase 3.
  3. Phase 4: the key marks the dark-red blocks as high-density, 3-storey apartments and duplexes.
  4. Land zoned for active open space (sport and recreation) at the southern end.
  5. A 50 m setback from the M11.

BBA Architects for Greenleaf Group, "Inchanappa Masterplan", Rev B, Draft Issue, Nov 2026 (Design Statement Part 2, p.23). Phases 3 and 4 are not part of this application. The masterplan is drawn for Greenleaf Group; the applicant is Vastbreak Limited. The documents on the file don't say how the two are connected.

Three-storey blocks are not new here: the permission granted on appeal in April 2024 (21/1407) allowed two. This application has three. Later phases will be decided on their own merits, but within national policy that favours higher densities.

3Overlay: permitted, proposed and the masterplan at one scale

In short: slide between the permitted and proposed layouts to see what changes on the ground. The northern cluster stays; everything south of it is redrawn.

The three drawings are lined up on the same ground, at the same scale, using fixed features they share (the existing house by the R772, the roundabout and the large building to the south). Use the slider to fade from the permitted layout to the proposed one, and zoom in to compare.

Compare

Zoom

Slide left for the permitted layout, right for the proposed one; in between, both show through. The proposed drawing covers the southern half only. Drag or scroll to move around when zoomed. Positions are approximate: lined up by eye, not surveyed.

Draft Inchanappa masterplan Permitted site layout Proposed site layout

Layers: BBA Architects, As Granted Site Layout (1:500), Proposed Site Layout (1:500, drawing G-123-PL-SL-1001A) and Inchanappa Masterplan (Draft Issue, Rev B); lined up by me on shared features, so treat positions as approximate, not surveyed.

4The layout, marked up

In short: a new stand-alone creche, three 3-storey duplex blocks, a road curving out to the eastern boundary, and terraces in place of semis, all within the orange line.

The same two drawings as in the overlay, cut to an identical frame at the same scale, with numbered points. North is at the top.

As-granted site layout with numbered markers

Permitted (as amended by later permissions 24/60647 and 26/60716)

  1. The northern cluster of 27 houses, which is kept. The permitted creche (numbered unit 01 on the drawings) is at its northern corner, beyond this view.
  2. The estate road already runs out to the eastern edge here, as a short stub.
  3. The southern housing area: 3- and 4-bed semis, detached houses and bungalows. All of it is replaced.
  4. The two permitted 3-storey blocks: 8 one-bed apartments with 8 two-bed duplexes above. Also replaced.
Proposed site layout with numbered markers

Proposed (26/61054)

  1. New stand-alone 2-storey creche (magenta), 1,019 m², 37 car spaces, 41 bike spaces, about 34 staff. It sits on the western side, beside the park.
  2. The estate road is realigned on a wide curve to the eastern boundary. The green dashed strip is extra land taken in so the road can be built. The masterplan continues it into Phase 3.
  3. The three new 3-storey duplex blocks (brown): 24 apartments.
  4. Orange line: the area being redesigned. Everything outside it stays as permitted.
  5. The southern edge is moved out to add open space.
  6. The northern cluster of 27 houses is unchanged, including unit 01, which is where the permitted creche was drawn.
  7. The woodland and park along the western side are kept as permitted.

5Open space: six new pockets, 3,449 m² in all

In short: 3,449 m² of public open space is added in six pockets, but with 20 more homes, open space per home falls slightly, from about 240 m² to 229 m².

Public open space drawing with six new areas in magenta

The magenta areas are new. The blue hatched area is the park already permitted under 21/1407 (23,534 m², mostly the woodland on the western side), which is unchanged.

AreaWherem²
1North-east corner, beside the entrance road1,063
2Small strip on the western edge86
3Pocket by the eastern road166
4Green inside the road curve, by the duplex blocks539
5Pocket on the western edge, north of the creche243
6Southern tip, beside the large existing building1,352
Total new public open space3,449

With 20 more homes, public open space per home falls slightly: about 240 m² per home permitted (23,534 m² ÷ 98) against about 229 m² proposed (26,983 m² ÷ 118). Two-thirds of the new space is in the two end pieces (1 and 6), and the smallest (2) is 86 m².

Source: Ronan MacDiarmada + Associates, Public Open Space drawing 05-POS, lodged with 26/61054. Per-home figures are my own arithmetic.

6The homes: what changes

In short: Phase 1 grows from 98 to 118 homes. 71 permitted homes (55 houses, 8 apartments and 8 duplexes) are replaced by 67 houses and 24 duplex apartments.

Every unit in Phase 1, before and after. Only the northern cluster (units 2 to 28 on the permitted drawing) is kept. Everything in the southern part, including the two permitted 3-storey apartment blocks, is replaced.

Houses kept as permitted (27) Permitted houses being replaced (55) Permitted apartments and duplexes being replaced (16) New houses (67) New duplex apartments (24)

Sources: planning report pp.2, 7; permitted layout (unit numbers); 21/1407 description: "82 no. … houses … and 8 no. 1 bedroom apartments with 8 no. 2 bedroom duplexes above in 2 no. three storey blocks".

7Sizes and mix: smaller homes on average, and far fewer four-beds

In short: four-bed homes fall from 25 to 2, and the average home is 11% smaller. The cuts come from changing the type of home: 2-bed duplexes of 113–115 m² become 2-bed apartments of 74 m² (about 35% smaller), and four-beds averaging 161 m² become two of 139 m². Where the type stays the same, sizes barely change: the new 3-bed houses are about 3% smaller than the permitted 3-bed semis.

This compares only the 71 homes being replaced with the 91 replacing them. Colours show the direction of change: blue ▲ = more or bigger, orange ▼ = fewer or smaller.

Show the building form and bedroom tables

Building form

FormPermittedProposed (change)
Detached houses53 ▼ (−40%)
Semi-detached houses3612 ▼ (−67%)
Bungalows and dormer bungalows144 ▼ (−71%)
Terraced houses048 ▲ (new)
Apartments and duplexes1624 ▲ (+50%)

Bedrooms

BedroomsPermittedProposed (change)
1-bed homes80 ▼ (−100%)
2-bed homes1524 ▲ (+60%)
3-bed homes2365 ▲ (+183%)
4-bed homes252 ▼ (−92%)
Homes7191 ▲ (+28%)
Bedrooms in total207251 ▲ (+21%)

Floor area: comparing the same kind of home

Show the floor-area table
Home typeSize changePermittedProposed
2-bed apartment or duplex−35% ▼
about 40 m² smaller
8 duplexes at 113–115 m²12 apartments at 74 m²
4-bed house−14% ▼
22 m² smaller than the average
25 at 134–173 m² (average 161 m²)2 detached at 139 m²
3-bed house−3% ▼
against the semis (3–4 m²)
16 semis at 117 m²
7 dormer bungalows at 103 m²
53 at 113–114 m² (40 terraced, 12 semi, 1 detached)
2-bed houseno change
bungalows; mid-terraces are new
7 bungalows at 65 m²4 bungalows at 65 m²
8 mid-terraces at 87 m²
1-bed apartmentdropped8 at 50–52 m²None
3-bed duplexnewNone12 at 117 m²
Average home−11% ▼c. 118 m²c. 105 m²

Every proposed home is above the national minimum sizes. The new 2-bed apartments are closest to the line: 74 m² against a 73 m² minimum for a 4-person 2-bed (planning report p.25). The permitted 3-bed semis were set against a 92 m² target.

Sources: 26/61054 Design Statement Part 2, p.18 (schedule of accommodation) and proposed layout legend; permitted sizes from the 21/1407 Design Statement schedule of units and the 24/60647 house type drawings (B 171, B1 172.7, C 146.9, C1 149, E 65, F 103.43 m²). Bedroom and form counts are my own tally from the permitted layout's unit numbers and legend. Percentages are my own arithmetic; the permitted floor-area total is approximate because the drawings give a range for the apartment sizes.

8Terraces instead of semis

In short: 36 semis become 48 terraces and 12 semis; typical rear gardens fall by 55%, and facing homes are about 16 m apart instead of about 25 m.

In the redesigned area, 36 semi-detached houses are replaced by 48 terraced houses and 12 semi-detached houses. Mid-terrace houses share walls on both sides and have narrower plots. On the applicant's own drawings, the typical rear garden falls from about 120 m² to about 54 m², and the smallest are 34 to 36 m².

120 ▼ 54 m²typical (median) rear garden (−55%)
34 m²smallest proposed rear gardens (8 homes at 34–36 m²)
0 ▲ 48terraced houses in the redesigned area
36 ▼ 12semi-detached houses (−67%)
Same-scale extracts of the permitted and proposed layouts: semi-detached houses with long gardens on the left, terraced houses with short gardens on the right
Extracts from the As Granted Site Layout (left) and the Proposed Site Layout (right), both 1:500, shown at the same scale. On the right, the dimension 16000 marks 16 m between the backs of facing terraces; on the left, the equivalent dimensions read 25,135 and 25,610 mm.
Show the comparison: gardens, privacy, noise, light, parking, spacing
Living-quality factorPermitted (mostly semis)Proposed (mostly terraces)
Rear gardenMostly 108–250 m² (median c. 120 m²); bungalows c. 50 m²−55% ▼ typical garden. Mostly 44–56 m² (median c. 54 m²). The counts match the house types: 16 gardens of 44 m² for the 16 three-bed mid-terraces, and 8 of 34–36 m² for the 8 two-bed mid-terraces. All meet the 2024 national minimum (40 m² for a 3-bed, 30 m² for a 2-bed), which replaced the older 50–75 m² guidance.
Privacy in the gardenNeighbours on one side; side passage or gable gives separationNeighbours on both sides for mid-terrace homes; narrower plots, so more windows look over each garden
Noise through wallsOne shared (party) wallTwo shared walls for mid-terrace homes. The Building Regulations on sound (Part E) set the same sound-insulation standard for each wall, so the difference is how many neighbours you share walls with, not a lower standard.
Light and outlookWindows possible on three sidesFront and back only for mid-terrace homes
Bins and bikesSide access to the rear gardenBike stores in front gardens of the 2- and 3-bed mid-terrace houses (report p.9). Mid-terrace homes without a rear lane bring bins through the house or store them at the front.
ParkingOn the home's own plotThe report says every one of the 67 houses has parking on its own plot (p.9), so this is not a loss
Distance between facing homesAbout 25 m between the backs of facing houses (25,135 and 25,610 mm on the as-granted layout)16 m between the backs of facing terraces (16,000 mm on the proposed layout). That is the minimum the 2024 guidelines allow where rear windows of habitable rooms face each other, as they do here

Families

Our view The Phase 1 creche is sized for about 204 children and "future phases", while the homes most suited to larger families drop from 25 four-beds to 2 in the redesigned area (36 to 13 across Phase 1). On the other hand, 65 of the 91 new homes are 3-beds, which suit many families, and national and county policy favours a wider mix including smaller homes, as average household size falls. The change is less about whether the scheme suits families than about which ones.

Garden areas: the "m²" labels on the as-granted layout (matched against the 21/1407 schedule, where they are the private open space figures) for the 51 replaced houses that carry one, and the "POS" (private open space) labels on the proposed 1:500 layout. Medians are my own arithmetic. Minimums: Sustainable Residential Development and Compact Settlements Guidelines (2024), SPPR 1 and SPPR 2.

9Who this scheme now suits Our view

In short: many more 3-bed homes for couples and smaller families, but far fewer for larger, home-working, multigenerational and single-person households, and for downsizers wanting a bungalow.

The change doesn't make the scheme unsuitable for families. It narrows which households it suits: many more homes for couples with one or two children, but far fewer for larger, home-working, multigenerational and single-person households, and for downsizers who want a small house with a garden.

HouseholdPermittedProposed (change)What it means
Larger families (three or more children)25 four-beds
36 across Phase 1
2 ▼ (−92%)
13 across Phase 1
In the new 3-beds (bedrooms of 15.3, 12.3 and 8.2 m²), two of three children share.
Families who need a room to work from home25 four-beds2 ▼A couple with two children in a 3-bed has no spare room. 37% of Wicklow's workforce worked from home at least one day a week in 2022.
Downsizers wanting a small single-storey house with a garden14 bungalows and dormer bungalows4 ▼ (−71%)The type many older residents move to, so they can stay in the town, mostly disappears.
Step-free living (older people, people with a disability)15
8 ground-floor apartments, 7 bungalows
16 ▲
12 ground-floor apartments, 4 bungalows
No loss: step-free homes are about the same in number.
Single people and first-time buyers on their own8 one-beds0 ▼ (−100%)The one-bed option disappears. The smallest homes are now 65 m² two-bed bungalows and 74 m² two-bed apartments. Prices aren't part of a planning application, but larger homes generally cost more, so a single buyer's cheapest way into the scheme is likely to cost more than a one-bed would have.
Multigenerational households25 four-beds, 14 bungalows2 four-beds, 4 bungalows ▼Little room to house an elderly parent or adult child with a family.
Couples with one or two children23 three-beds65 ▲ (+183%)Many more homes of this kind, mostly terraced 3-beds of similar design, with gardens of about 44–56 m².

Local context: Wicklow's average household (2.84 people) is larger than the national average (2.74), and Wicklow families average 1.36 children (Census 2022, county figures; no Ashford-only figure was readily available).

Sources: CSO Census 2022 Profile 3 and Summary Results press statements for Wicklow; bedroom sizes from BBA House Type B drawing G-123-PL-HTB-200; counts as in the tables above.

10The apartment blocks: design and setting

In short: three longer 3-storey blocks replace two. The stone detailing and aluminium-clad windows of the 2024 permission were already removed in September 2026, by a separate permission (26/60716). This application keeps that buff brick, white render and grey uPVC palette; what it changes is the number, length and layout of the blocks, and their front entrances.

How the design of the blocks has changed

WhenPermissionWhat it did to the blocks
April 202421/1407, granted on appealTwo blocks with stone-clad entrance piers and bays, reconstituted stone bands, plinths and cappings, aluminium-clad (Aluclad) windows and individual coloured front doors. The design statement linked the stone to Inchanappa House.
September 202626/60716, granted by the CouncilStone cladding, bands, plinths and cappings removed; grey brick changed to buff or cream brick; windows and doors changed to grey uPVC; reconstituted stone sills kept on front elevations; individual coloured front doors kept; side windows omitted and rear windows and doors rearranged. The same changes were made to the houses. No appeal was made.
November 202626/61054, this applicationThree longer blocks with 2-bed apartments and 3-bed duplexes; same palette of brick, render and uPVC; entrances grouped under a flat canopy.

Sources: Council planner's report on 26/60716 (25 September 2026) and BBA Architects drawings lodged with 26/60716; 21/1407 Design Statement and CDP Architecture drawings; 26/61054 drawings.

Both front elevations below come from the architects' own 1:100 drawings and are shown at the same scale, so their heights and lengths can be compared directly. None of the three computer-generated images (CGIs) lodged with this application clearly shows the new blocks, so drawings are the fairest like-for-like comparison.

Permitted apartment block front elevation as amended in September 2026: white render above buff brick, grey windows, coloured front doors

Permitted block, as amended in September 2026: 2 blocks of 8 units

12.27 m from ground floor to the top of the roof (the ridge). One-bed apartments below, two-bed duplexes above. About 24 m long. White render above buff or cream brick, grey uPVC windows, front doors in four colours. The blue lines on the drawing point to its list of materials.

BBA Architects drawing G-123-PL-HTG+H-201, lodged with 26/60716

Show the original 2021 design of the same block
Original 2021 permitted apartment block front elevation with stone-clad entrance piers

The block as first permitted: stone-clad entrance piers and bays, stone bands and window surrounds, Aluclad windows. Replaced by the September 2026 design above.

CDP Architecture drawing 3.1.210, 21/1407

Proposed duplex block front elevation

Proposed block (26/61054): 3 blocks of 8 units

About 11.8 m to the top of the roof (11,800 mm on the drawing). Two-bed apartments below, three-bed duplexes above, with an access bridge at the back. About 32 m long, in two stepped halves.

BBA Architects drawing G-123-PL-HTDB-300

Show the comparison table
ElementPermitted block (as amended September 2026)Proposed block
Height to top of roof12.27 mabout 11.8 m ▼
Length of each blockAbout 24 mabout 32 m ▲
Number of blocks23 ▲
WallsWhite render above buff or cream brickWhite render above a buff or cream brick ground floor
Detailing150 mm reconstituted stone sills to the front; metal-capped parapetsPlain openings
WindowsGrey uPVCGrey uPVC
Front doorsIndividual front doors in four colours (bog oak black, blue, green, red)Entrances grouped under a flat canopy
RoofBlack flat tiles or slatesBlack flat tiles or slates

What the documents say about the setting

2021 design statement (original permission): the blocks use "hints of reconstituted stone" and "reconstituted stone banding is visible around windowsills as it refers to Inchanappa Ashford Country House".
21/1407 Design Statement, p.14

September 2026, Council planner on 26/60716: the changes are "not considered to significantly alter the overall appearance of the development", and the new finishes are "acceptable in terms of design and visual amenity". The report notes the site was part of the grounds of Inchanappa House; it doesn't refer to the house as a Protected Structure.
Planner's report, 26/60716, pp.3–4

2026 design statement (this application): "The external finishes consist mainly of buff traditional brick facing, smooth white render, and grey/black roof tiles". Part 2 adds "stone window reveals" for the scheme generally; the block drawings don't show any. Its answer on the setting of protected structures is about setbacks and overlooking.
Design Statement Part 1, p.15; Part 2, pp.1, 8 and 11

Our view Most of the change in materials has already been permitted, in an application treated as minor and assessed on its own. This application builds on it with more and longer blocks. The setting question is now a cumulative one: whether the scheme as it would be built still meets the design quality accepted on appeal in 2024 for a site beside a Protected Structure (the Development Plan's SLO 5 "Inchanappa – Inchanappa House", Record of Protected Structures no. 25-10, and Ashford objective ASH11).

How the applicant pictures the new homes

The three CGIs lodged with the application. None clearly shows the three duplex blocks.

CGIs by 3D Design Bureau for Vastbreak Limited, from the CGI booklet lodged with 26/61054.

11The bigger picture: weighing it up

In short: 20 more homes and a much larger creche, against fewer four-bed homes, smaller gardens and homes, more and longer 3-storey blocks beside a Protected Structure, and a road and creche sized with later phases in mind.

What the applicant says

  • Density: Phase 1 goes from 20 to about 25 homes per hectare (net), which the report says is within the 25–40 range that the 2024 Compact Settlements Guidelines set for the edge of small to medium-sized towns. It points to bus routes 131, 133 and 183 on the R772 (pp.3, 20).
  • Layout: the report describes "an appropriate density, in line with the County Development Plan and the 2024 Compact Guidelines", with new pedestrian links, overlooked open spaces and roads designed to national street standards (DMURS) (pp.7–8).
  • Mix of homes: 24 two-bed, 65 three-bed and 2 four-bed homes, a mix the report says was chosen to respond to "the identified housing needs of the Ashford area and the wider county" (p.31).
  • Creche: national childcare guidelines suggest about 25 places for 91 homes; the creche has about 204, "deliberately sized" to serve future phases on the same landholding too (p.12).
  • Open space: public open space rises from about 32.7% to 38% of the site, 26,983 m² in all (p.3).

Source: McGill Planning, Planning Report lodged with 26/61054 (page numbers given). Summarised in my words, with the applicant's own phrases in quotation marks.

Weighing it up Our view

Taken together, the amendment adds 20 homes and a large creche to Phase 1, and changes what kind of place the southern half becomes. Whether that's a good trade is a judgement for each reader. Here are the points for and against, drawn from the sections above.

Points in favour

  • 20 more homes in a time of housing need, taking Phase 1 from 20 to about 25 homes per hectare (net), at the bottom of the 25–40 range national guidance sets for the edge of towns of Ashford's size
  • More 2- and 3-bed homes (38 → 89), suited to couples and smaller families
  • A much larger creche, for about 204 children
  • Six new public open spaces, 3,449 m² in all
  • Homes face onto streets and parks

Points of concern

  • 36 semi-detached houses replaced by 48 terraces and 12 semis
  • Typical rear gardens cut by more than half (about 120 → 54 m²), and facing homes closer (about 25 m → 16 m)
  • Less variety: four-beds 25 → 2, bungalows 14 → 4, one-beds 8 → 0, and most new homes are 3-bed terraces
  • Smaller homes: the average is 11% smaller, and 2-bed homes shrink from 113–115 m² duplexes to 74 m² apartments
  • Three longer 3-storey blocks near Inchanappa House, following the removal of their stone detailing in September 2026 (26/60716); no heritage assessment was found on the file
  • A possible second access for the creche that isn't in the description, and no traffic assessment
  • Road and creche designed around a 390-home masterplan marked "Draft Issue"
  • Inconsistencies in the documents: "71 permitted houses", and a site boundary described as both unchanged and amended

Questions to ask yourself

  1. Does the new mix of homes suit the households Ashford has and needs, including larger families, people working from home and older residents?
  2. Is the standard of gardens and spacing right for a town of Ashford's character, or is meeting the national minimum enough?
  3. Does the new design respond well enough to its setting beside Inchanappa House, a Protected Structure?
  4. Should decisions that shape Phases 3 and 4, such as the road and the creche size, be made before the masterplan is agreed and consulted on?
  5. Do the extra homes, the creche and the new open spaces outweigh what is lost?

You can ask the Council to grant, refuse, seek further information, or attach conditions, for example on materials, the mix of homes, or a statement that approval doesn't endorse the draft masterplan. Have your say explains how.

12Loose ends, gaps and questions

In short: the application describes the 71 homes it replaces as "houses" and gives the site boundary two ways; it shows a second creche access not in the description; and I couldn't find heritage, traffic, social infrastructure or tree assessments on the file (as at 27 November 2026). 9 items in all.

Show all 9 loose ends, gaps and questions

Things in the applicant's own documents that don't add up, assessments I couldn't find on the planning file as at 27 November 2026, and the questions they raise. Assessments are sometimes folded into other reports, and more documents may be added once the application is validated, so check the file. The Council may decide some aren't needed, or ask the applicant for them ("further information").

One assessment the public notice does mention: a Natura Impact Statement has been prepared. That is an assessment of the scheme's possible effects on protected European nature sites, as the parent permission also had.

  1. "71 permitted houses". The application says 71 permitted houses are replaced. The permitted layout numbers the kept cluster as units 2 to 28 (27 houses), and the two apartment blocks (units 69 to 84) sit inside the area being redesigned. So the 71 replaced homes are 55 houses and 16 apartments and duplexes. The same wording runs through the planning report, design statement, tree report and construction plan.

    Question: Will the description be corrected so the public knows what is being replaced?

  2. Is the site boundary changing? The planning report says both. The permitted site was 6.84 ha (An Bord Pleanála's decision); the new schedule gives 71,888 m² (about 7.19 ha).

    Planning report page 2: the red line site boundary remains unchanged from that of the parent planning permission
    Planning report, page 2
    Planning report page 7: Amendment to the red line boundary to provide additional open space to the south and to facilitate the construction of the estate road to the east
    Planning report, page 7

    Question: Is the boundary being extended, and what is the added land zoned for?

  3. A second way in? Not found on file: traffic assessment The planning report says access is unchanged, from the R772 roundabout. But the design statement shows "an Existing Access" on the site's western edge (Part 1, p.4) and a photo captioned "Existing second access to service proposed creche" (p.11), and the masterplan key includes an "Indicative Vehicle, Cycling & Pedestrian Route – Creche". There is no traffic assessment on the file, although a creche for about 204 children, with about 34 staff and 37 parking spaces, is added.

    Question: Is a second vehicle entrance from the R772 proposed, and if so, why isn't it in the description, and how has the creche traffic been assessed?

  4. Two creches, and when the new one opens. The permitted creche (unit 01) is in the part being kept and is still drawn on the new layout. The original permission (An Bord Pleanála, now An Coimisiún Pleanála, condition 2(c)) says no more than 75 homes may be occupied before the creche is open.

    Question: Will unit 01 still be a creche, and will the 75-home condition apply to the new one?

  5. Design beside Inchanappa House. Not found on file: heritage assessment The 2021 design statement tied the permitted blocks' stone detailing to Inchanappa House, a Protected Structure. That detailing was removed by a separate permission in September 2026 (26/60716), and the Council's report on it doesn't refer to the Protected Structure. The redesigned area now extends towards the house's outbuildings, and there is no heritage or architectural impact assessment on the file.

    Question: Has the effect on the setting of Inchanappa House been assessed for the scheme as a whole, including the September 2026 changes?

  6. The mix of homes, and local services. Not found on file: social infrastructure audit The County Development Plan (objective CPO 6.27) requires "a range of unit types … to suit the needs of the various households in the county"; the applicant's answer refers only to the apartment guidelines. The report says no social infrastructure audit is needed for "an additional 20 houses", but 91 homes are being built in the redesigned area.

    Question: How does the new mix meet CPO 6.27, and have schools, GPs and other services been assessed?

  7. Future phases decided early. The road is built to the eastern boundary and the creche is sized for "future phases", both following a 390-home masterplan marked "Draft Issue".

    Question: Has the masterplan been agreed with the Council, will the public see it before Phase 3, and when would the eastern road connect onward?

  8. Trees on the added land. Not found on file: tree survey of added land The tree report is a 4-page letter; the newly added land to the south and east isn't separately surveyed.

    Question: Which trees on the added land would be removed?

  9. Figures that don't agree. The redesigned area is "approximately 1.97 hectares" (Design Statement Part 1, p.3) and 3.12 ha (p.4). Residential cycle parking is 142 spaces (planning report p.23; Design Statement Part 1, p.22), 171 (Part 2, p.3), and "183 proposed residential cycle parking" (planning report p.9), a total that includes the creche's 41.

    Question: Which figures are correct?

13How to have your say

Anyone can make a written observation on a planning application, supporting it, objecting to it, or asking for changes. The Council must take valid observations into account when it decides.

StepWhat to do
1. DeadlineThe Council's register gives 7 January 2027 as the last date for submissions; they must arrive by 5pm that day. Don't leave it to the last day.
2. Fee€20, paid when you lodge it. Without the fee the observation isn't valid. You can pay by card over the phone on 0404 20148.
3. Lodge itOnline through the Local Government Ireland Planning System portal (you register first, and can pay there); by email to plandev@wicklowcoco.ie (pay the fee by card on 0404 20148); or by post to Planning Department, Wicklow County Council, County Buildings, Wicklow Town.
4. IncludeYour name and address, the reference 26/61054, and your points. Observations become part of the public planning file, with your name, so leave out anything you wouldn't want published.

What makes an observation count

  • Write in your own words. Several individual observations usually carry more weight than identical copies of one letter.
  • Stick to planning matters: the mix of homes, design, open space, access, the setting of Inchanappa House, how this fits the Development Plan. Property values and who the developer is don't count.
  • Be specific, and say what you'd like the Council to do: refuse, ask for more information, or attach conditions.
  • Be accurate. Quote the application's own documents where you can.

What happens next

StageWhat it means
ValidationOn 27 November 2026 the register listed the application as awaiting validation. If the Council finds it invalid, it goes no further; a new application would have its own notices and its own chance to comment.
DecisionThe register gives 28 January 2027 as the decision date. The Council can grant permission (usually with conditions), refuse it, or first ask the applicant for further information.
Further informationIf the Council asks for more information and the reply is significant, the applicant must publish new notices and the public can comment again. The decision date then moves.
AppealThe applicant, and anyone who made a valid observation, can appeal the decision to An Coimisiún Pleanála (formerly An Bord Pleanála) within 4 weeks of it. A fee applies. In general, if you don't make an observation now, you can't appeal later.
If it's refusedThe existing permission for 98 homes (21/1407, as amended by 24/60647 and 26/60716) still stands and can still be built. A refusal stops the changes, not Phase 1.

Source: Wicklow County Council planning register and guidance. Check the Council's or the Commission's websites for current fees and time limits before you rely on them.

Source: Wicklow County Council, "Planning Objections" guidance. The full application is on the Council's ePlanning site under reference 26/61054.

14Questions and answers

Ask anything about the application or this page. I'll answer in batches once a week and publish the answers here, without your name unless you ask me to include it.

Ask a question

Privacy: how your details are used

Questions are collected with Tally, a form service based in Belgium that stores data in the EU. Peter Love is responsible for what you send (the "data controller"). Your details are used only to answer you and to publish the question here, without your name unless you ask. They are not shared, and all submissions are deleted within six months of the final decision on this application, including any appeal. You can ask to see or delete what you sent at any time. If you are unhappy with how your data is handled, you can complain to the Data Protection Commission. Full privacy notice.

Answered so far

No questions answered yet. The first answers will appear here within a week of the page going live.

Sources and credits

All figures come from the documents on Wicklow County Council's planning files: 26/61054 (received 25 November 2026), including the McGill Planning report, BBA Architects drawings, Design Statement Parts 1 and 2, the Ronan MacDiarmada + Associates open space drawing and the construction waste plan; 24/60647 (house type drawings); and 21/1407 (Design Statement, schedule of units and CDP Architecture drawings); 26/60716 (planner's report and BBA Architects house type drawings). Drawings are reproduced for comment and review, credited to their authors; the originals are on the Council's ePlanning site. The parent permission is An Bord Pleanála case PL27.313953. Policy quotes are from the Wicklow County Development Plan 2022–2028, Chapter 6, and the 2024 Sustainable Residential Development and Compact Settlements Guidelines. Census figures are from CSO Census 2022 (Wicklow). Counts, medians and percentages are my own arithmetic from those documents.

If you own material shown on this page and object to its use, please contact me through the questions form and I'll review it or remove it promptly.