Planning application 26/61066 · Ballinalea, Ashford · Observations close 7 January 2027 (register date; see the status note)

What's planned at Ballinalea, Ashford, and how to have your say

Rycroft Estates Limited has applied to build 85 homes, a floodlit all-weather pitch and a multi-use games area on fields south of the Usher Glen, Meadow View and Woodview estates and the homes on Rossana Close, and east of Ashford Rovers Football Club. It is the second phase of a larger plan: in October 2026 the council decided to grant the same company 87 homes on the land next door, and that decision is under appeal. This page explains the application in plain English, using its own drawings and figures, so readers can form their own view.

Status, 28 November 2026: awaiting council validation. The council received the application on 25 November 2026 and is checking that it is complete and properly advertised. This is called validation, and the register shows it as "pre-validation". If the council finds it valid, the application continues towards a decision and the closing date stays as the register shows. If it finds it invalid, the application is returned to the applicant, there is nothing to comment on, and this page will say so promptly and be revised or withdrawn.

85homes: 55 houses and 30 apartments
172homes across both phases, with the 87 next door (26/60290)
7,028 m²active open space, with an all-weather pitch and a games area
41.5homes per hectare (net), as the applicant calculates it

In 60 seconds

  1. 85 homes on greenfield land south of Usher Glen, Rossana Close and Woodview, mostly terraced houses: 28 two-beds with a study, 23 three-beds and 4 four-beds, plus 30 apartments in two three-storey blocks.
  2. Beside Ashford Rovers FC, the scheme includes a floodlit all-weather pitch and a multi-use games area (MUGA, a fenced hard court for several sports) on land the town plan reserves for active open space.
  3. It is phase 2. Its road runs through the phase 1 land to phase 1's entrance, and the 42 parking spaces for the sports pitches are in phase 1 (26/60290, 87 homes). The council decided to grant phase 1, but that decision is under appeal to An Coimisiún Pleanála.
  4. The town plan says the sports land must be laid out and dedicated to public or sports club use before any homes start. The application doesn't set out how that order would be secured.
  5. The council's housing section has said it is "not agreeable in principle" to the social housing (Part V) offer: one home short, too large, and all in one part of the site.
  6. There is no crèche in this phase; it would rely on phase 1's. Some supporting reports contain phase 1's figures (87 homes and a crèche).

How to have your say →

Who made this page

Written for polity.ie, an independent, non-partisan civic project, by Peter Love, who lives in Ashford and takes part in other Ashford planning matters. As of 28 November 2026 he has made no submission or appeal, and had no contact with councillors, on this application or on phase 1 next door (26/60290), and he has no involvement with either site. Facts are sourced and kept separate from opinion, which is marked Our view. The applicant's own case is set out in section 12. Spotted a mistake? Say so using the questions form and it will be corrected.

Not affiliated with Wicklow County Council or the applicant. Not legal or planning advice. Last updated 28 November 2026.

1Where it is

In short: sloping grass fields on the southern edge of Ashford, behind Usher Glen, Rossana Close and Woodview, with Ashford Rovers FC to the west and open farmland to the south and east.

Open grass field sloping away under a wide sky, with trees and hedgerow along the far boundary
The site looking west from its northern boundary. Photo: IMG Planning Limited, Planning Report (Plate 3), 26/61066, reproduced for comment and review.
Street map of the south side of Ashford showing the approximate Ballinalea site south of Rossana Close and east of Ashford Rovers AFC, with the L1096 to the west
Approximate location only, placed from the Department of Housing's national planning applications map point for the earlier application 22/291 on the same land. For the exact boundary, see the Site Location Map on the Council's ePlanning file. Map © OpenStreetMap contributors; outline and label added.

The application site is 4.65 ha in all, including the access road and open space; the part to be built on with homes (the "net" site) is 2.050 ha. Today the land is under grass. A stream runs along the northern boundary, with trees and hedgerow and the back gardens of existing houses beyond it. Another stream, with mature trees, separates the site from Ashford Rovers FC on the west. The ground falls about 7 m from west to east.

The applicant's planners describe the site as about 2.5 km north-west of Rathnew, with the M11 about 1 km to the east. The estates next door are mostly 1.5 and 2-storey houses; Usher Glen, the most recent, also has a three-storey duplex block. Ashford had 1,892 people in Census 2022, as quoted in the application.

In the Ashford Town Plan (part of the Wicklow County Development Plan 2022–2028), most of the housing area is zoned "RN: New residential" and the western part "AOS: Active open space". The homes and the sports land fall under specific local objective SLO4, "Ballinalea (south of Woodview)": see section 4. The access road crosses the phase 1 land, which has its own objective, SLO3.

Sources: IMG Planning, Planning Report for 26/61066 (November 2026), pp.2–3, 18, 67 and 69; application form (site area).

2The story so far

In short: nothing has ever been built or permitted on this site. A 2022 plan for 60 homes was withdrawn. The developer now plans two phases: 87 homes next door (council decision to grant, under appeal) and these 85.

WhenReferenceWhat happened
March to September 202222/291An application for 60 homes on this land, with road access through the Rossana Close, Woodview and Ashleigh estate roads and the Meadow View cul-de-sac, was lodged on 25 March 2022 and withdrawn on 13 September 2022.
29 September 2025LRDPP25/82Pre-planning meeting with the council about both land parcels: "SLO3" to the north-west and "SLO4", this site. The developer planned to build them in two phases. The council's issues included the crèche, open space and active open space at Ashford Rovers, phasing, and Part V (social housing).
April to October 202626/60290 (phase 1)87 homes and a crèche on the SLO3 lands, with the new road from the L1096. After further information, the council decided on 8 October 2026 to grant permission, with 29 conditions. Because it was appealed, there is no permission yet: An Coimisiún Pleanála will decide the case afresh.
October and November 2026PL-502372-WW-26Phase 1 was appealed to An Coimisiún Pleanála (formerly An Bord Pleanála). Correspondence on the council's file shows one third-party appeal notified on 2 November and three more on 6 November. The appeal is undecided.
25 November 202626/61066 (this application)Rycroft Estates Limited applies for 85 homes, the pitch and the MUGA on the SLO4 lands. Its agent is IMG Planning; the architects are PD Lane Associates.

Sources: IMG Planning, Planning Report for 26/61066, pp.5 and 10; Wicklow County Council register and file for 26/60290 (grant of 8 October 2026; planner's report; An Coimisiún Pleanála correspondence of 2 and 6 November 2026); register for 26/61066. No individual appellant is named on this page.

3The layout

In short: the road comes in from the north-west through phase 1, passes the pitches, and loops round a grid of terraced houses. The two apartment blocks sit along the northern edge, facing the Usher Glen side. An area for holding back rainwater is at the southern tip.

Master site layout showing phase 1 outlined in green to the north-west, the access road running south-east from the L1096 through it, the Ashford Rovers pitches, and phase 2 with the new pitch and the housing

Both phases together

  1. Phase 1 (26/60290): 87 homes and a crèche; council decision to grant, under appeal.
  2. The access road (red outline) from the L1096, near the top of the drawing, through phase 1.
  3. Ashford Rovers FC's existing pitches.
  4. This application's all-weather pitch and MUGA.
  5. The road continues into this site.
  6. The houses.
  7. Surface water attenuation area (it holds rainwater back and releases it slowly).

PD Lane Associates, Master Site Layout Plan M-173-142 (1:1000). Markers placed by eye.

Site layout of phase 2 showing the all-weather pitch and MUGA in active open space on the west, two apartment blocks to the north, terraced houses in the centre and south, and an attenuation area at the southern tip

This application

  1. On Ashford Rovers' side: a car park and an "area reserved for new dressing rooms", next to the club's existing all-weather pitch, which is to remain.
  2. New all-weather pitch, floodlit, inside "Public Open Space (Active)" of 3,542 m².
  3. New MUGA (multi-use games area).
  4. One of the two three-storey apartment blocks (simplexes below, duplexes above).
  5. Internal road and parking in front of the houses.
  6. Green space between the apartment blocks.
  7. "Area for Surface Water Attenuation".
  8. The road from phase 1 enters here, with a road and footpath link to Ashford Rovers FC.
  9. Strip of open space along the northern stream, behind the Rossana Close and Usher Glen gardens, labelled "Public Open Space Active", 3,486 m². The documents polity.ie read don't say what active use is planned for it.

PD Lane Associates, Site Layout Plan 1 (1:500). Markers placed by eye.

The road through the phase 1 land to the L1096 is itself part of this application. No car access is proposed through the existing estates, unlike the withdrawn 2022 plan; there would be a future walking and cycling link to Usher Glen. The application also includes an ESB substation and new water and sewer connections through the Usher Glen, Rossana Close, Woodview and Ashleigh estate roads and open spaces, which would mean works in those areas during construction. Foul water would drain to the existing Woodview pumping station, which serves Usher Glen; Uisce Éireann has said a connection is feasible subject to sewer upgrades. Some of the land involved belongs to the council, which has given written consent to the application being made over it.

During construction. An outline of construction measures, included in the Natura Impact Statement, says construction traffic, deliveries and waste would use the L1096, on routes to be agreed with the council, and that the contractor would prepare a traffic management plan for the council's approval before work starts. Working hours would be 7 am to 6 pm Monday to Friday and 8 am to 2 pm on Saturdays, with no work on Sundays or bank holidays unless the council agrees, and a contractor's liaison person would consult local residents. polity.ie did not find specific arrangements for the pipe and cable works in the existing estates. Source: Altemar, Natura Impact Statement, p.70.

Sources: 26/61066 public notice and cover letter (IMG Planning, 25 November 2026); IMG Planning, Planning Report, pp.9–10; Donnachadh O'Brien, Infrastructure Design Report, s.5; CEng, Traffic and Transport Assessment, p.30; Wicklow County Council letter of consent, 10 November 2026; drawings M-173-140 and M-173-142.

4The pitch and open space

In short: a floodlit all-weather pitch and a MUGA on the zoned sports land beside Ashford Rovers. The town plan requires that land to be laid out and dedicated to public or sports club use before any homes are started.

According to the applicant's planning report, objective SLO4 of the Ashford Town Plan requires the land to be developed for homes and open space, "subject to the AOS area being laid out and suitably developed by the landowner to be suitable for active sports use and dedicated to public/sports club use prior to commencement of any residential development". The applicant's planners say the scheme is consistent with this because the homes are on the residential land and the pitch and MUGA are on the sports land.

Two rows. SLO4 sets an order: sports land laid out, then dedicated, then homes start. The planning report says the build order will be set by the contractor, with no fixed phases. What SLO4 requires Ashford Town Plan objective, as quoted in the applicant's planning report 1. Sports land laid outpitch and MUGA built 2. Dedicated for sportfor public or club use 3. Homes start"prior to commencement of anyresidential development" What the planning report says "will not be constructed in distinct or definable phases but rather in an optimum sequence that will be determined by the contractor"
SLO4 sets an order: the sports land is laid out and dedicated before any homes start. The planning report leaves the build order to the contractor. The application does not set out how that order would be secured.
Open spaceAreaNotes
Active open space (pitch, MUGA and the northern strip)7,028 m²Two areas on the layout: 3,542 m² and 3,486 m²
Public open space for residents3,470 m²16.9% of the net site
Communal open space for the apartments230 m²
Children's play areanot statedShown on the landscape masterplan, according to the planning report

Floodlights. The lighting designer's report treats the area as a rural edge (zone E2 in the Institution of Lighting Professionals' guidance, which sets tighter limits than for towns) and predicts less than 5.0 lux of light falling on nearby houses. polity.ie did not find proposed hours of use for the floodlights in the documents it read. Hours of use are commonly set by a planning condition.

Parking for sport. The traffic report says "the sports facilities are served by 42 no. car parking spaces provided as part of Phase 1". The layout also shows a car park and a reserved area for dressing rooms on the club's side of the boundary. No dressing rooms are applied for here.

Who would own and run it. The application proposes that all roads and public open space be taken in charge by the council (taken over and maintained by it). The Taking in Charge map (drawing M-173-165) shades the pitch and MUGA, the open spaces and the roads, including the road through the phase 1 land, as "Area to be Taken in Charge", which suggests the pitch would pass to the council rather than to Ashford Rovers. The documents polity.ie read don't say when, or who could book it, and polity.ie did not find a letter from the club on the file.

Sources: IMG Planning, Planning Report, pp.9, 40, 63 and 69; Schedule of Open Space (PD Lane, November 2026); Site Layout Plan 1; Taking in Charge Map M-173-165; Veelite Lighting, Outdoor Lighting Report, p.1; CEng, Traffic and Transport Assessment, pp.7, 30 and 49, and Travel Plan.

5The homes

In short: 55 houses, almost all in terraces, and 30 apartments. Two-bed and three-bed homes make up 81 of the 85. There are no one-bed homes and only four four-beds.

2-bed + study houses 3-bed houses 4-bed houses 2-bed simplexes 3-bed duplexes
Type of homeFormNumber
Type B and B1: 2-bed plus studyEnd-of-terrace, two storeys28
Type C: 3-bedMid-terrace, two storeys23
Type A: 4-bed plus studySemi-detached, 2.5 storeys4
Type J1: 2-bed simplex apartmentGround floor, own front door15
Type K1: 3-bed duplex apartmentFirst and second floors, own front door15
All homes85
Car parking161 spaces, all on the surface (2 disabled, 11 visitor)
Bike parking72 spaces for the apartments (48 residents', 24 visitors')

The apartments are in two blocks: Block 1 holds homes 1 to 16 and Block 2 homes 17 to 30. Houses are numbered 31 to 85.

Sources: 26/61066 public notice; Schedule of Accommodation and Housing Quality Assessment (PD Lane, November 2026); drawing list in the cover letter, p.2. The council's Part V letter puts the offered social homes in the apartment blocks (section 10).

6Sizes and gardens

In short: every home type is above the national minimum floor area, the apartments by a wide margin. The three-bed terraced houses have the tightest gardens, at 43 m² against a 40 m² minimum.

Home typeFloor areaNational minimumPrivate outdoor space
2-bed + study house (B/B1, 4 people)99 m²80 m²garden 54–71 m² (minimum 30)
3-bed house (C, 5 people)106 m²92 m²garden 43 m² (minimum 40)
4-bed + study house (A, 7 people)139.12 m²120 m²garden 57 m² (minimum 50)
2-bed simplex (J1, 3 people)88.60 m²63 m²14–14.5 m² (minimum 6)
3-bed duplex (K1, 5 people)129.17–132.02 m²90 m²10.2 m² (minimum 9)

The three-bed houses meet the room standards with little to spare: their bedrooms add up to 32.34 m² against a 32 m² minimum, and storage is 5.10 m² against 5 m². For the two-bed houses, storage is listed simply as "attic". The apartments are well above minimum size, which, as section 10 explains, is one reason the council's housing section rejected them for social housing.

Sources: Housing Quality Assessment (PD Lane, November 2026); Schedule of Open Space; IMG Planning, Planning Report, pp.7–8. Garden minimums are those quoted in the Schedule of Open Space.

7Height and density

In short: mostly two-storey houses, four 2.5-storey semis and two three-storey apartment blocks. The density, 41.5 homes per hectare by the applicant's figures, is above the 25 to 40 range the applicant's own planners quote.

Height. The public notice describes the apartment blocks as three storeys; the Schedule of Accommodation calls them "2.5 storey". The four Type A houses are 2.5 storeys. Everything else is two storeys. The applicant says the apartment blocks were placed "having regard to the existing houses in the adjoining Ushers Glen estate" and that the scheme meets the national minimum of 16 m between opposing upper-floor windows. The daylight report found no neighbouring windows close enough to need detailed testing, no change in sunlight to neighbouring gardens, and concludes the scheme is "not expected to result in any notable change to the daylight and sunlight received by neighbouring properties". polity.ie did not find exact distances from the new blocks to existing houses in the documents it read.

Density. The planning report gives 85 homes on 2.050 ha net, 41.5 homes per hectare, and says this is "marginally above" the 25 to 40 per hectare range for an extension of Ashford but "generally accords" with policy. The same report reads Variation No. 5 of the County Development Plan, in force since 30 March 2026, as moving Ashford into a "Rural Town or Village" tier, where density is to be "tailored to the scale, form and character of the settlement". The council's planner's report on phase 1, written after Variation No. 5, applied the 25 to 40 range and found 34.8 per hectare acceptable there. Whether 41.5 is acceptable here is a judgement for the council.

Neighbours to the north. The daylight and sunlight report found that none of the neighbouring gardens to the north would lose a material amount of sunlight, because of the distances, the modest height of the new buildings and the layout. Block 1 runs parallel to the existing homes to the north, with the internal road and open space between them. The documents read for this page don't state the distances between the new homes and the existing houses behind them. Source: 3D Design Bureau, Daylight and Sunlight Assessment, p.8.

Growth targets. Variation No. 5 sets a target of 489 more homes between 2025 and 2031 across five small towns: Ashford, Aughrim, Carnew, Dunlavin and Tinahely. The council's planner's report on phase 1 deducted 191 homes already permitted but not started, leaving "a further 181 units" of growth to 2031 across the five towns. The two Ballinalea phases together are 172 homes.

Bar chart. The council's planner gives a further 181 homes of growth to 2031 for five towns together. The two Ballinalea phases total 172 homes. 0100200 Growth left to 2031, five townsAshford, Aughrim, Carnew, Dunlavin, Tinahely 181 Ballinalea phases 1 and 2one site in Ashford 172 Homes. The 181 is after deducting 191 homes already permitted but not started.
The council's planner, in the report on phase 1, gives "a further 181 units" of growth to 2031 for Ashford, Aughrim, Carnew, Dunlavin and Tinahely together. The two Ballinalea phases add up to 172 homes.

Sources: 26/61066 public notice; Schedule of Accommodation; IMG Planning, Planning Report, pp.18, 20, 66–67 and 71; 3D Design Bureau, Daylight and Sunlight Assessment, p.20; Wicklow County Council planner's report on 26/60290, pp.15 and 22–23.

8Who the scheme suits Our view

In short: mainly couples and smaller families buying a terraced house. Little for single people, and little for older people wanting a single-level home that isn't an apartment.

HouseholdWhat's on offerWhat it means
Couples, or a family with one child28 two-bed houses with a studyThe largest group. The study suits home working.
Families with two or three children23 three-bed mid-terrace houses, 15 three-bed duplexesPlenty of three-beds, though gardens on the terraced houses are close to the minimum.
Larger families4 four-bed semisVery few.
Single people and downsizers15 two-bed ground-floor simplexesNo one-bed homes. The simplexes are on one level with their own front door, which may suit downsizers.
People needing social housing16 apartments offered; council wants 17, smaller and spread outNot settled. See section 10.

The council's decision on phase 1 restricts first occupation to individual buyers or people eligible for social or affordable housing, not companies (condition 3); the appeal will set phase 1's final conditions. Any permission here would carry whatever conditions the council attaches to it.

Sources: sections 5 and 6 above; 26/60290 decision to grant, condition 3.

9Phase 1 next door, the appeal, and traffic

In short: this scheme relies on phase 1: its road follows phase 1's road to phase 1's entrance, and its sports parking is in phase 1, which is under appeal.

MeasurePhase 1 (26/60290)Phase 2 (26/61066)Together
Homes8785172
Houses6155116
Apartments263056
Crèche331.26 m²noneone
Car parking177161338
Status (28 November 2026)Decision to grant; under appealAwaiting validation

What phase 2 relies on

Diagram: the access road, crèche and sports parking for phase 2 all sit on or with phase 1, which is under appeal. Foul water goes separately to the existing Woodview pumping station. L1096public road Phase 1 land (26/60290) 87 homes · decision to grant, under appeal Entrance and access road in this application, but on phase 1's layout Crèche, 45 places phase 2 has none of its own 42 parking spaces for the pitches "provided as part of Phase 1" Phase 2 (26/61066) 85 homes floodlit pitch and MUGA awaiting council validation foul water Woodview pumping station existing; does not depend on phase 1 Magenta: things phase 2 gets through phase 1. If the appeal refuses phase 1 or changes its road, the application does not say what happens.
What phase 2 relies on phase 1 for. The road is part of this application but follows phase 1's layout and entrance; the crèche and the sports parking are in phase 1. Foul water would go to the existing Woodview pumping station.
  • The road. The only vehicle access is the road through the phase 1 land to the L1096. It is included in this application, but it follows phase 1's layout and uses phase 1's entrance (drawing M-173-166, "Permitted Site Entrance details").
  • Sports parking. The 42 spaces for the pitches are "provided as part of Phase 1", according to the traffic report.
  • Design assumptions. The daylight report says the scheme "has been designed on the basis that it [phase 1] will be in place", although it adds that its own results would be the same without phase 1.

If An Coimisiún Pleanála refuses phase 1, or changes its road or entrance, this scheme's access could be affected. The application doesn't say what would happen then. The council could decide this application now with conditions (for example, no homes occupied until the road and entrance are built), ask for further information, or, less usually, refuse it as premature until the appeal is decided.

What residents raised about phase 1

Phase 2 has no public submissions yet, because the council only accepts them once the application is validated. On phase 1, the council received 19 submissions from third parties (one of them on behalf of 52 residents in 32 households) and 5 more after the further information. The council's planner summarised the issues as: traffic, the road network and sight distances; parking; pedestrian access; loss of trees and wildlife; overlooking, overbearing buildings and noise; density; flooding and surface water; effects on European sites; design and height; strain on community facilities and water supply; going beyond the county's core strategy; precedent and future development; and property values.

Four third-party appeals, all from local residents, ask An Coimisiún Pleanála to refuse phase 1 or change it. Their grounds include:

  • the safety of the L1096 for people walking and cycling into Ashford: there is no cycle lane, and residents report the footpath narrowing to about 45 cm and 72 cm at two points (their own measurements, not a survey);
  • that traffic from the planned connections to Ashford Rovers and the SLO4 lands, which is this application, should be assessed together with phase 1 rather than one scheme at a time;
  • privacy, boundary hedges and mature trees for the existing homes beside phase 1 in Ashford Oaks and Grangelea;
  • the quality of phase 1's open space and the lack of a public park or playground (one appeal notes that the Ashford Rovers pitch is fenced off);
  • whether Ashford's schools and services can keep up with the growth.

Several of these points apply to phase 2 as well. It would use the same road and entrance onto the L1096, and its traffic is the SLO4 traffic the appeals refer to. Its own traffic report says that near the site "footpaths are intermittent", and cites Town Plan objective ASH9, which seeks better footpaths, cycleways and traffic calming. The new pitch and MUGA are shown as areas to be taken in charge by the council (section 4).

Sources: council planner's reports on 26/60290, report A p.12 and report B p.4; third-party appeal documents on the council's file for 26/60290 (An Coimisiún Pleanála correspondence of 2 and 6 November 2026); CEng, Traffic and Transport Assessment for 26/61066, pp.17 and 25. No resident or appellant is named on this page.

Traffic

The traffic report, based on counts on 24 February 2026 at five junctions, forecasts 54 two-way car trips in each of the morning and evening peak hours from phase 2, and 112 (morning) and 110 (evening) from both phases together. Two junctions on Cronroe Road, at Ballymacahara Road and at Ballinalea Road, would see increases over the 10% level that triggers detailed modelling. That modelling shows both well within capacity: the highest ratio of traffic to capacity is 0.23, where 1.0 would mean a junction at capacity. The report also notes a fatal collision on the L1096 south-west of Ashford on the collision map it reproduces, without details of when or why.

Sources: 26/60290 decision to grant (8 October 2026); 26/61066 public notice and cover letter, p.3; IMG Planning, Planning Report, p.9; CEng, Traffic and Transport Assessment, pp.7, 30, 36–37, 40 and 44–46; 3D Design Bureau, Daylight and Sunlight Assessment, p.3. Phase 1 and 2 totals are polity.ie's arithmetic.

10Social housing, childcare and schools

In short: the council's housing section is "not agreeable in principle" to the social housing offer, there is no crèche in this phase, and two community reports contain phase 1's figures.

Social housing (Part V)

Developers must normally provide 20% of new homes as social or affordable housing. For 85 homes that is 17. The planning report says the proposal "proposes 20% Part V units". The council's housing section, in a letter of 16 November 2026 on the file, says it is "not agreeable in principle" to the offer of 16 apartments (8 two-bed simplexes and 8 three-bed duplexes), because:

  • "a minimum of 17 units is required to meet the 20% Part V requirement";
  • the units are "significantly oversized": 88 m² against a 73 m² target for two-beds, and 129 to 132 m² against 100 m² for three-beds;
  • there is "an over concentration of social housing in one area of the site", and units should be "pepper potted" through the scheme.
Part V. Required 17 social homes, offered 16. Two-bed homes offered at 88 square metres against a 73 square metre target. Three-bed homes offered at 129 to 132 square metres against 100. All offered homes are in the two apartment blocks; the council wants them spread through the scheme. Number of homes Required (20% of 85) 1716 Offered Floor area per home (m²) 050100150 2-bed: council target73 2-bed: offered88 3-bed: council target100 3-bed: offered129–132 Where: all 16 offered homes are in the two apartment blocks. The council wants them "pepper potted" through the scheme.
The council's housing section is "not agreeable in principle" to the Part V offer: one home short, larger than its targets, and all in one part of the site. The letter is preliminary.

The letter is described as preliminary; final Part V terms are agreed only after permission is granted. Part V is usually secured by a condition requiring an agreement with the council before work starts, as in condition 8 of the council's decision on phase 1.

Childcare

The County Development Plan asks for 20 childcare places for every 75 homes. The planning report says "A crèche facility is not proposed". The council's decision on phase 1 includes a crèche for about 45 children; its planner calculated that phase 1 alone needed 24 places. Condition 9 requires that crèche to be built and available before more than half of phase 1's homes are occupied, unless otherwise agreed. By the same ratio, both phases together would need about 46 places. This phase relies on phase 1's crèche.

Schools and community facilities

The School Demand Assessment estimates 49 school-age children (28 primary, 21 post-primary). It describes the scheme as "85 no. dwellings comprising 61 no. houses and 26 no. apartments together with a crèche", which is phase 1's mix, and bases its estimate on 247 residents, worked out from 87 homes. Its table of homes does use this scheme's mix. The Social and Community Infrastructure Audit gives 87 homes on its first page and refers to a crèche for about 45 children, although it also quotes this application's description correctly. This application has 85 homes and no crèche.

Sources: Wicklow County Council (Housing), Part V letter of 16 November 2026, pp.1–2; IMG Planning, Planning Report, pp.43 and 47; School Demand Assessment, pp.2 and 5–6; Social and Community Infrastructure Audit, pp.1 and 11–12; 26/60290 decision to grant, conditions 8 and 9, and planner's report, p.30. 17 (20% of 85) and 46 (20 per 75 homes, for 172) are polity.ie's arithmetic.

11Nature, trees and flooding

In short: the streams on the edge of the site link it to The Murrough, a protected wetland 2.7 km away, so a full Natura Impact Statement was needed. It concludes there would be no harm with mitigation. Five trees and part of a hedgerow would go. The homes are in Flood Zone C, the lowest flood-risk category.

Protected sites. The Rathnew Stream runs along the northern and western edges of the site. Because it drains towards The Murrough Wetlands Special Area of Conservation and The Murrough Special Protection Area, about 2.7 km away, the applicant commissioned a Natura Impact Statement from Altemar. It says that without mitigation, run-off carrying dust and other construction pollutants could reach the stream, sets out measures to prevent this, and concludes that, with them, there will be no adverse effect on the integrity of either site. The council must reach its own conclusion (an "appropriate assessment") before deciding.

Trees. The tree survey by CM Arbor covers 216 trees and groups. It proposes removing five trees and part of a hedgerow. It recommends that the route of a wastewater pipe be reviewed so that a mature oak (tree T188) can be kept.

Environmental impact assessment. The applicant's planners say the scheme is below the thresholds for a mandatory environmental impact assessment (500 homes, or 10 ha in a built-up area). The planning report also refers to an Ecological Impact Assessment by Altemar; polity.ie did not find one listed on the file.

Flooding. The flood risk assessment places all the homes and the access roads in Flood Zone C, the lowest-risk category, so no further justification test is needed. Surface water would be held in an attenuation area and released to a watercourse to the south.

Sources: Altemar, Natura Impact Statement (November 2026); CM Arbor, Arboricultural Report; Donnachadh O'Brien Consulting Engineers, Site Specific Flood Risk Assessment; IMG Planning, Planning Report, pp.69–70; 26/61066 public notice.

12Weighing it up

What the applicant says

  • The land is zoned for housing, so "the principle of developing 85 no. residential units ... on the site is acceptable".
  • The scheme meets SLO4 because the homes are on the residential land and the pitch and MUGA are on the active open space land.
  • It offers "a sustainable mix of generously sized dwellings", all apartments are dual aspect, and the homes exceed national space standards.
  • Houses are set back from the southern and eastern boundaries, and the apartment blocks were placed with the Usher Glen houses in mind; "overlooking and overshadowing will not arise".
  • The site is "the next sequentially available zoned land that can be delivered", within easy walking and cycling distance of bus services, and will help meet Ashford's housing targets.
  • Services can be connected, perimeter planting is kept and added to, and there will be no adverse effect on the protected sites.
  • Traffic from phase 2 can be handled by the local junctions with plenty of spare capacity.

Sources: IMG Planning, Planning Report, pp.8, 38, 69 and 70–71; CEng, Traffic and Transport Assessment. Summarised, with the applicant's own phrases in quotation marks.

Weighing it up Our view

This is zoned land, and the town plan expects homes and sports facilities here. The main questions are less about whether to build than about order, dependency and detail.

Points in favour

  • A new floodlit all-weather pitch and MUGA next to the local club, on land zoned for sport
  • Homes above national space standards, with a study in most two-beds
  • Homes in the lowest flood-risk zone, and most trees kept
  • Traffic modelling shows the junctions coping comfortably
  • Walking and cycling links to Usher Glen and to the club

Points of concern

  • Reliance on phase 1, which is under appeal, for the road, the entrance and the sports parking
  • No clear mechanism for laying out and dedicating the sports land before homes start, as SLO4 requires
  • The council's own housing section is "not agreeable in principle" to the Part V offer
  • No crèche of its own, and school and community reports that contain phase 1's figures
  • Density above the range the applicant itself quotes, and, with phase 1, close to the council's remaining growth figure for five towns
  • No stated hours for the floodlights

Questions to ask yourself

  1. Should permission for this phase wait for the appeal decision on phase 1?
  2. How should the council make sure the pitch and MUGA are built and dedicated before any homes start?
  3. Should homes here be occupied before phase 1's crèche is open?
  4. Would the floodlights need a condition on hours of use?

The council can grant, refuse, ask for further information or attach conditions, for example on phasing, the sports land, Part V or floodlighting. Have your say explains how.

13Loose ends and questions

In short: 10 points where the documents disagree, something seems to be missing, or a question could fairly be put to the council (as at 28 November 2026). The last groups smaller drafting slips, which are often corrected at further information stage.

Show all 10 loose ends
  1. When does the sports land come first? SLO4 requires the active open space to be laid out and dedicated "prior to commencement of any residential development". The planning report says the scheme "will not be constructed in distinct or definable phases but rather in an optimum sequence that will be determined by the contractor". Objectives like this are usually secured by a condition that no homes start until the sports land is done, sometimes with an agreement or bond. Question: how would the order SLO4 requires be secured, and how would the club and the public get to use the pitch?
  2. Dependence on phase 1. The road, the entrance and the sports parking rely on 26/60290, under appeal (PL-502372-WW-26). Question: should conditions tie this phase to the completion of phase 1's road, entrance and crèche?
  3. 42 sports parking spaces. The traffic report says these are "provided as part of Phase 1". The council's decision on phase 1 describes 177 spaces and 3 crèche visitor spaces, and doesn't mention sports parking. The phase 2 layout shows a car park beside the club's pitch. Question: is that the 42 spaces, and which permission covers them?
  4. Part V. The planning report says the scheme "proposes 20% Part V units"; the council's housing letter says 16 is one short and is "not agreeable in principle" to the offer.
  5. Reports containing phase 1's figures. The School Demand Assessment's population estimate uses 87 homes and describes phase 1's mix with a crèche; the Social and Community Infrastructure Audit gives 87 homes and a crèche; the planning report's text lists phase 1's house mix (4 two-bed, 43 three-bed and 14 four-bed) beside a table with the correct one; and the traffic report's text calls a phase 1 table "Phase 2". The figures this scheme's case relies on may need to be redone.
  6. Floodlight hours. Not found in the documents polity.ie read. Question: when would the floodlights be on?
  7. Noise from the pitch and MUGA. polity.ie did not find any assessment of noise from games or training on the new pitch and MUGA. Question: has noise from evening use been considered, and would hours of use be limited?
  8. Distances to existing homes. The daylight report finds no material loss of sunlight in neighbouring gardens, but the documents read don't state the distances between the new homes and the existing houses to the north. Question: what are the back-to-back distances to Usher Glen, Rossana Close and Woodview?
  9. Documents not on the file, or not yet read. The planning report refers to an Ecological Impact Assessment that polity.ie did not find in the file list. polity.ie has not read the Construction and Environmental Management Plan, the Landscape Rationale, or the public lighting report.
  10. Smaller inconsistencies in the documents.
    • Density: 41.5 homes per hectare (planning report p.18), 34.9 (p.40) and about 34.8 (p.43); 34.8 is the council's figure for phase 1.
    • Housing targets: 515 (p.37) and 489 (p.66).
    • Car parking: the notice says 161; the planning report's tables add up to 156 (110 for houses, 46 for apartments); the design statement states 161, but its own rates (2 per house, 1.5 per apartment and 11 visitor spaces) add up to 166.
    • One-bed homes: the planning report mentions "1, 2 and 3+ bedroom" units and the design statement "1 bed own door simplex apartments"; all simplexes are two-bed. The design statement names the client "Rycroft Investments Limited".
    • The Schedule of Open Space lists house types Q, R, E and F for homes 62 to 68, which appear nowhere else, and calls some Type C houses two-bed.
    • Site area: 4.65 ha in the application form and planning report; 4.3938 ha in the traffic report.
    • Storeys: three-storey apartment blocks in the notice; "2.5 storey" in the Schedule of Accommodation.

Sources: IMG Planning, Planning Report, pp.7, 9, 18, 32, 37–40, 43, 66 and 69; Design Statement (PD Lane), pp.2, 7 and 9; Schedule of Open Space; Schedule of Accommodation; CEng, Traffic and Transport Assessment, pp.7, 28–30, 35 and 49; School Demand Assessment; Social and Community Infrastructure Audit; Part V letter; 26/60290 decision to grant and planner's report, p.23; 26/61066 file list (iDocs, 28 November 2026); Veelite Outdoor Lighting Report.

14How to have your say

Anyone can make a written observation on a planning application, supporting it, objecting to it, or asking for changes. The council must take valid observations into account when it decides.

StepWhat to do
1. ValidationThe application is awaiting validation. The closing date counts from the day the council received it (25 November 2026), not from validation, so validation adds no time. An observation can be made now. If the application is found invalid, it is returned to the applicant; check with the council what happens to any observation and fee already lodged. The register shows the current status.
2. DeadlineThe register gives 7 January 2027 as the last date for submissions (five weeks from 25 November 2026, with the Christmas period not counted). The council says observations must be received by 5 pm on the closing date, so a posted letter must arrive by then. Check the register in case the date changes.
3. Fee€20, paid when you lodge it. Without the fee the observation isn't valid. You can pay by card over the phone on 0404 20148.
4. Lodge itOnline through the Local Government Ireland Planning System (register first, then choose "Create a submission"; you can pay there, and only one document can be uploaded); by email to plandev@wicklowcoco.ie (pay the fee by card on 0404 20148); or by post to Planning Department, Wicklow County Council, County Buildings, Wicklow Town.
5. IncludeYour name and address, the reference 26/61066, and your points. Observations become part of the public planning file, with your name, so leave out anything you wouldn't want published.

What makes an observation count

  • Write in your own words. The council weighs planning points, not the number of letters, so a short letter that makes a clear point is more useful than a copy of someone else's.
  • Stick to planning matters: the sports land and SLO4, phasing and the link to phase 1, density, the mix of homes, Part V, childcare, floodlighting, traffic, construction works, ecology. Property values and who the developer is don't count.
  • Be specific, and say what you'd like the council to do: refuse, ask for more information, or attach conditions.
  • Be accurate. Quote the application's own documents where you can.

What happens next

StageWhat it means
ValidationThe council checks the application is complete. If it is invalid, it is returned and the process stops (the applicant can apply again).
DecisionThe register gives 28 January 2027 as the decision date. The council can grant permission (usually with conditions), refuse it, or first ask the applicant for further information.
Further informationIf the council asks for more information and the reply is significant, the applicant must publish new notices and the public can comment again. The decision date then moves.
AppealThe applicant, and anyone who made a valid observation, can appeal the decision to An Coimisiún Pleanála within 4 weeks, beginning on the date of the decision. A fee applies. In general, without an observation now, there is no right to appeal later.
Phase 1The appeal on 26/60290 is a separate case, which An Coimisiún Pleanála decides afresh. Its outcome will matter here, because this scheme's road and sports parking depend on it.

Sources: Wicklow County Council planning register and its "Planning Objections" guidance (wicklow.ie, checked 28 November 2026); 26/61066 site notice; Planning and Development Act 2000 and Planning and Development Regulations 2001, as amended. Check the council's or the Commission's websites for current fees and time limits before relying on them.

15Questions and answers

Ask anything about the application or this page. Answers are published here in weekly batches, without your name unless you ask for it to be included.

Form not showing? Open it in a new page. Privacy: how your details are used.

Answered so far

No questions answered yet. The first answers will appear here within a week of the page going live.

Corrections

None yet.

Sources and credits

All figures come from documents on Wicklow County Council's planning files: 26/61066 (received 25 November 2026), including the IMG Planning cover letter and Planning Report, PD Lane Associates drawings, Design Statement, Housing Quality Assessment and schedules, the CEng Traffic and Transport Assessment and Travel Plan, the Donnachadh O'Brien Infrastructure Design Report, the Altemar Natura Impact Statement, the CM Arbor Arboricultural Report, the Donnachadh O'Brien flood risk assessment, the Veelite Outdoor Lighting Report, the 3D Design Bureau daylight report, the School Demand Assessment and the Social and Community Infrastructure Audit, and the council's Part V letter and letter of consent; and 26/60290 (decision to grant of 8 October 2026, planner's reports and appeal correspondence). Not read for this page: the Construction and Environmental Management Plan, Landscape Rationale, and Fallon Design public lighting report. Drawings are reproduced for comment and review, credited to their authors; the originals are on the council's ePlanning site. Counts, totals and percentages marked as such are polity.ie's own arithmetic from those documents.

Site photo: IMG Planning Limited, Planning Report (Plate 3), on the council's file for 26/61066, reproduced for comment and review. Diagrams and charts: polity.ie, drawn from the documents listed above.