Planning application 26/61019 · Keatingstown Farm, Ballynerrin, Wicklow town · Observations close 21 December 2026

What's changing at Keatingstown, and how to have your say

Sweetspot Keatingstown Limited has applied to change the house types in a permitted scheme of 13 homes on the old Keatingstown farmyard, beside the Keatingstown estate and Hawkstown Road. The scheme was granted on appeal in January 2026. This page explains the changes in plain English, using the application's own drawings and figures, so readers can form their own view.

13 = 13homes: the number stays the same
7 ▼ 2four-bed homes (−71%)
3 ▲ 8three-bed homes, all two-storey semis
1,080 ▼ 983 m²public open space (−9%)

In 60 seconds

  1. The scheme stays at 13 homes. What changes is the type of home: seven four-beds become two, and three-beds go from three to eight.
  2. The three-storey terrace and the terraced bungalows go. Every home becomes semi-detached, apart from one detached bungalow.
  3. The two new four-beds are bigger than before (142 m² against 115.5 m²); the three-beds and bungalows are smaller.
  4. Public open space shrinks by about 97 m², to about 983 m², although the cover letter says its location "remains the same".
  5. Between back gardens, 2 m timber fences with concrete posts are proposed. Condition 5(a) of the existing permission (a binding requirement attached to it) requires 1.8 m rendered block walls around all rear gardens.
  6. Bats were the main open issue at appeal, settled by a survey and mitigation conditions. No bat or ecology report was found on this application's file (checked 28 November 2026).

How to have your say →

Who made this page

Written for polity.ie, an independent, non-partisan civic project, by Peter Love, who lives in Ashford and has no involvement with this site or the Keatingstown estate. Facts are sourced and kept separate from opinion, which is marked Our view. Spotted a mistake? Say so using the questions form and it will be corrected.

Not affiliated with Wicklow County Council or the applicant. Not legal or planning advice. Last updated 28 November 2026.

1Where it is

In short: a small, sloping former farmyard on the western edge of Wicklow town, at the junction of Broomhall Road and Hawkstown Road, entered from inside the Keatingstown estate.

Map of the west of Wicklow town showing the approximate location of the Keatingstown Farm site beside Hawkstown Road and the Keatingstown estate
Approximate location only, placed by eye from the Department of Housing's national planning applications map point for the earlier application 23/390. For the exact boundary, see the Site Location Map on the Council's ePlanning file. Map © OpenStreetMap contributors; outline and label added.

The site is about half a hectare (0.55 ha in the 2023 application, 0.5325 ha in this one). It holds a disused farmhouse and farm sheds, and is extensively overgrown. Hawkstown Road runs along its eastern side, Broomhall Road to the north, and the roads of the Keatingstown estate to the west and north-west. The ground falls towards Hawkstown Road; the back gardens on that side sit about 3 to 6 m above the road, according to the developer.

The Keatingstown estate next door is mostly single-storey and dormer detached houses on generous plots (66 homes were permitted in 1995), generally on higher ground than the site. The secondary school is about 55 m from the estate junction with Broomhall Road.

Under the Wicklow County Development Plan 2022–2028, Wicklow Town–Rathnew is a "Key Town", home to about 16,500 people (Census 2022, as quoted in the 2025 Local Area Plan). The Council's planner's report on 26/130 describes the site as zoned "Existing Residential". The Wicklow Town–Rathnew Local Area Plan 2025, in force since 23 June 2025, now sets zoning for the town; polity.ie has not yet confirmed the site's zoning under it (checked 28 November 2026).

Sources: ABP inspector's report on ABP-318978-24 (paras 1.1.1–1.1.4, 2.1.2, 7.4.3, 7.4.6, 7.5.3); Council planner's report on 26/130, p.2; 26/61019 Housing Quality Assessment; Sweetspot Keatingstown Limited letter to the Council, 19 November 2026 (on file 23/390).

2The story so far: two permissions, and now a third application

In short: 13 homes were permitted after a long appeal centred on bats. The previous owner then won a small change in September 2026. A new owner, Sweetspot Keatingstown Limited, now wants different house types.

WhenReferenceWhat happened
201818/526 (ABP-302253-18)9 detached houses refused on appeal. Reasons included poor integration with the Keatingstown estate and its open spaces, houses backing onto open space, no walking or cycling route through, and a density too low for a serviced site.
April 2023 to January 202423/390Application for 13 homes. The Council asked for further information (extra details from the applicant before deciding) on 11 points, including integration with the estate, a bat survey, a tree survey and boundaries, then decided to grant permission, with 25 conditions, on 8 January 2024. That decision was appealed, so the appeal decision replaced it.
February 2024 to January 2026ABP-318978-24A local residents' association appealed. Grounds included density, house types, "an estate within an estate", the safety of the open space, traffic near the school and sewer overflows. The inspector accepted the density, traffic and layout, but recommended refusal in January 2025 because there was no bat survey. The appeals body asked for a full bat assessment (February 2025), received it in June and September 2025, and granted permission with 24 conditions on 12 January 2026. By then An Bord Pleanála had been renamed An Coimisiún Pleanála (June 2025), but the decision is still headed "Board Order", so this page calls it "the Board". The permission runs to 11 January 2031.
June to September 202626/130The previous owner was granted bigger living areas at the back of houses 4 to 10, using newer national rules that allow shorter gardens. Final grant 22 September 2026. The new owner's planners say this permission "was not put into effect".
August to November 202623/390 complianceA developer contact, copying a Sweetspot address, asked the Council whether a commencement notice (the formal notice that building work is starting) was needed for "the demolition and enabling works package"; the Council replied that site clearance did not need one, but construction would. On 19 November it lodged a boundary scheme under condition 5. The register showed no commencement date on 28 November 2026. A Building Control commencement notice is separate from the planning conditions, which apply to the permitted works, demolition included.
17 November 202626/61019 (this application)Sweetspot Keatingstown Limited, which says it "recently acquired the lands" and is "eager to commence development", applies to change the house types and layout.

Sources: Wicklow County Council planning register for 23/390, 26/130 and 26/61019; Council planner's report on 26/130 (planning history); ABP inspector's report and addendum report, and Board Order, ABP-318978-24; correspondence on file 23/390 (23 October and 24 November 2026); 26/61019 cover letter, Simon Clear & Associates, pp.2–3.

What residents raised, and what the inspector found

Twelve third-party observations were sent to the Council on 23/390, and a local residents' association appealed. The inspector said the observations were "largely covered by the grounds of appeal". Below are the main concerns, and what the inspector or the Board found on each. (No observations had been made on this application, 26/61019, by 28 November 2026.)

ConcernWhat was found
Traffic near the secondary schoolThe school is about 55 m from the estate junction with Broomhall Road. On the site visit, the inspector saw traffic rise when the school closed, a "temporary peak", but found 13 homes "of a relatively small scale" and saw no safety risk, noting the footpaths. The Council's Roads section did not object.
Sightlines at the entranceThe appeal said only 18 m could be seen with traffic turning right. The layout shows 60 m in each direction, and the national street design manual (DMURS) asks for 45 m on a road designed for 45 km/h. The inspector was satisfied after the site visit.
Parking spilling into the estateTwo off-street spaces per home, which meets the County Development Plan and is the maximum national guidelines allow (SPPR 3). There are no visitor spaces. The inspector did not expect "any significant level" of parking in the wider estate, and added a condition for electric car charging.
Construction trafficBoard condition 17 requires a Construction Management Plan, agreed in writing with the Council before work starts, covering construction traffic, noise and dust. Condition 18 limits work to 7 am to 7 pm on weekdays and 8 am to 2 pm on Saturdays, with none on Sundays or public holidays.
Sewer overflows in the estateThe appeal said the estate's sewer regularly overflows into gardens. The inspector noted that the permitted homes connect to the public main sewer at the Keatingstown junction on Broomhall Road, not to the estate's own pipes; the Council's water section raised no capacity concern; and the Wicklow treatment plant was listed as having "available capacity" in December 2024. Uisce Éireann (the national water utility) made no submission.
Demolishing the old farm buildingsThe County Development Plan (CPO 8.18) discourages demolishing traditional buildings. The inspector noted they are not protected structures, the farm use ended in 1995, and on balance found the demolition acceptable for housing on an infill site. The stone is to be reused on boundaries (condition 5).
Details left to conditionsThe appeal argued that many details were left to conditions agreed later between the developer and the Council, with no chance for residents to comment. The inspector found the conditions appropriate.
Upkeep, and the estate's boundaryThe appeal asked who would maintain the new homes' roads and open space, and asked for the estate's northern boundary wall and screen planting to be kept. The applicant said it expected the Council to take the estate "in charge" (adopt its roads and services). On the boundary, see loose end 12.

Sources: ABP inspector's report, ABP-318978-24, paras 3.4.1, 6.1, 7.4, 7.5, 7.6 and 7.10, and the applicant's response to the appeal summarised there; Board Order conditions 5, 17 and 18. Concerns are summarised by theme; no individual is named.

3The layout, before and after

In short: the same entrance and the same open space at the western end, but terraces become semi-detached pairs, on-street parking moves onto each plot, and the internal road appears to run further around the northern and eastern edge.

Both drawings come from one sheet lodged by the applicant's architects ("Permitted vs Proposed"), shown at the same size. Hawkstown Road runs along the bottom of each.

Permitted site layout for 23/390 with lettered markers: open space at the western end, a terrace of three bungalows, a two-storey terrace of three, two pairs of semi-detached houses and a three-storey terrace of three

Permitted (23/390)

  1. Open space with trees at the western end, also serving the estate.
  2. Terrace of three 2-bed bungalows.
  3. Two-storey terrace of three 4-bed houses.
  4. Two pairs of 4-bed semi-detached houses.
  5. Three-storey terrace of three 3-bed houses, on the lower ground by Hawkstown Road.

The sheet labels this "Granted Planning Permission; Site Layout". It looks like the 2023 application drawing; the final permitted drawings may differ in detail after further information and the appeal. Markers placed by eye.

Proposed site layout for 26/61019 with numbered markers: open space at the western end, the Hawkstown Road boundary, the unchanged entrance and the internal road

Proposed (26/61019)

  1. Open space at the western end, labelled "0.9828 Ha" on the drawing (the schedule gives 0.09828 ha, about 983 m²).
  2. Back gardens along Hawkstown Road, behind a 2 m black steel mesh fence with evergreen hedging.
  3. "No Changes to Permitted Entrance Layout", according to the drawing.
  4. Internal road (brown) and parking on each plot. The architects' note says "All on-street car parking is now replaced with on-curtilage car parking", meaning parking inside each plot.

The architects' note on the drawing also says "Layout remains as per the granted layout above", while the cover letter describes "some adjustments to the orientation of dwellings and the removal of terraces". Markers placed by eye.

Tegos Architects, "Permitted vs Proposed" (26/61019), p.2; Site Layout Plan 2605_SITE_0004 (1:250).

4Open space: slightly less, same place

In short: public open space falls from about 1,080 m² to about 983 m² (−9%). It is still above the 850 m² minimum quoted when the scheme was permitted.

MeasurePermittedProposed
Public open space0.108 ha (about 1,080 m²)0.09828 ha (about 983 m²) ▼
Share of the siteabout 19%18.45%
Minimum required (as quoted in 2025)0.085 hanot stated

The application gives the proposed figure three ways: "9828 sqm (.09828 Ha.)" in the Housing Quality Assessment and "0.9828 Ha" on the site layout. Only 0.09828 ha (983 m²) fits the site, which is 0.5325 ha in all, and the stated 18.45%.

The western open space is the one the appeal inspector expected to "serve the adjoining estate". The residents' appeal argued that it sits at a junction, runs alongside the road and is not overlooked by homes. The inspector found that the open spaces "will be overlooked" by the new homes.

Sources: ABP inspector's report, p.6 and paras 7.4.8 and 7.3 (appeal grounds, open space); 26/61019 Housing Quality Assessment (Tegos, Nov 2026) and Site Layout Plan. The change of 97 m² is polity.ie's arithmetic.

5The homes: same number, different mix

In short: four-beds fall from 7 to 2, three-beds rise from 3 to 8, and the 3 bungalows stay. Total bedrooms fall from 43 to 38.

2-bed bungalows 3-bed homes 4-bed homes
Type of homePermittedProposed (change)
2-bed bungalow3 (terrace)3 (2 semi-detached, 1 detached)
3-bed house3 (three-storey terrace)8 two-storey semis ▲
4-bed house7 (two-storey terrace and semis)2 two-storey semis ▼
Homes1313
Bedrooms in total4338 ▼ (−5)
Terraced homes90 ▼
Car parking26 (2 per home)26 (2 per home, all on the plot)

Sources: 26/61019 cover letter, pp.2–3 (both mixes); ABP inspector's report, p.6; Tegos "Permitted vs Proposed", p.2 ("Three blocks of 3 terraced units"); 26/61019 Housing Quality Assessment. Bedroom totals are polity.ie's arithmetic.

6Sizes and gardens

In short: the two four-beds get bigger, but the three-beds and bungalows get smaller, and the total floor area falls by about 3%. Gardens are a little smaller on average; every proposed garden is listed at 43 m² or more.

Home typeSize changePermittedProposed
4-bed house+23% ▲7 at 115.5 m²2 at 142.3 m²
3-bed house−8% ▼
on average
3 three-storey at 115 m²6 at 109.16 m² and 2 at 95.06 m²
2-bed bungalow−10% ▼
on average
3 at 84.6 m²3 at 75.2–77.93 m²
All 13 homes−3% ▼1,407 m² (average 108 m²)1,359 m² (average 105 m²)
Rear gardens50–98 m², average about 75 m² (2023 drawing)43–108 m², average about 67 m²

Two of the new three-beds (Type J, nos. 4 and 5) are planned for 4 people, not 5: two of their bedrooms are single rooms of 7.7 and 7.6 m². They are the smallest two-storey homes in the scheme, at 95 m².

Under the 2024 national Compact Settlements Guidelines, the minimum private garden is 30 m² for a 2-bed, 40 m² for a 3-bed and 50 m² for a 4-bed house. The smallest proposed gardens are 43 m² (a 3-bed), 46 m² (a 2-bed bungalow) and 55.52 m² (a 4-bed).

Sources: permitted sizes and gardens from the 23/390 Site Layout Plan (Alphaplan Design, April 2023, "Development Statistics"), whose sizes add up to the 1,407 m² in the ABP inspector's report; gardens may have changed at further information stage. Proposed sizes and gardens from the 26/61019 Housing Quality Assessment. Percentages and averages are polity.ie's arithmetic. Garden minimums: Sustainable and Compact Settlements Guidelines for Planning Authorities (January 2024), SPPR 2.

7Height and looks

In short: no home is taller than two storeys now. The permitted design's zinc flat-roof elements give way to pitched slate roofs, off-white render and buff brick.

Section B-B as permitted (bungalow terrace and two-storey terrace) above the proposed section (detached house, semi-detached pairs and bungalows)
Section B-B, permitted (top) and proposed (bottom). Tegos Architects, "Permitted vs Proposed" (26/61019), p.3.
Section C-C as permitted, showing a three-storey terrace beside Hawkstown Road, above the proposed section with two-storey semi-detached houses
Section C-C, permitted (top) and proposed (bottom). The three-storey terrace at top left, on the lower ground by Hawkstown Road, is replaced by two-storey houses. Tegos Architects, "Permitted vs Proposed" (26/61019), p.4.
ElementPermittedProposed
StoreysSingle-storey, two-storey and one three-storey terraceSingle-storey and two-storey only
Ridge heightNot found on file (checked 28 November 2026)About 9.2–9.4 m for the two-storey types A and B
WallsNap plaster finishOff-white render and buff brick
RoofGrey or black flat concrete tiles, with zinc to the flat roofsBlack slate roof tiles
WindowsNot found on file (checked 28 November 2026)uPVC

The Board's condition 3 required the west side of house no. 7 to be redesigned "as a dual fronted dwelling", because the inspector found it "visually poor". It is not clear from the new drawings how the new no. 7 deals with this.

Sources: ABP inspector's report, p.6 and paras 7.4.7–7.4.8; Board Order condition 3; 26/61019 house type drawings (Type A/B: ridge 9.398 m and 9.162 m) and Materials and Finishes drawing 2605_FINISHES_001.

8Who the scheme now suits Our view

In short: more homes for couples and smaller families, fewer for larger families, and about the same for people who need a bungalow.

HouseholdPermittedProposedWhat it means
Larger families, or a family that needs a home office7 four-beds of 115.5 m²2 four-beds of 142.3 m² ▼Fewer four-beds, but the two that remain are much roomier.
Couples with one or two children3 three-storey three-beds8 two-storey three-beds ▲Many more family homes of a conventional type, without stairs over three floors.
Downsizers and step-free living3 bungalows of 84.6 m²3 bungalows of 75–78 m²The same number, about 10% smaller, and no longer in a terrace.
First-time buyersSmallest two-storey home: 115.5 m²Smallest two-storey home: 95 m²The Type J three-beds may be the cheapest way into the scheme. Prices are not part of a planning application.

The Board's condition 20 limits first occupation of all 13 homes to individual buyers (not companies) or people eligible for social or affordable housing. A new permission would carry whatever conditions the Council attaches to it.

Sources: sections 5 and 6 above; Board Order, condition 20.

9Boundaries: timber fences in place of block walls

In short: the Board's condition 5(a) requires 1.8 m rendered block walls around all rear gardens. This application proposes 2 m timber panel fences between gardens, steel mesh along Hawkstown Road, and block walls only where gardens face the public.

Tegos boundary treatment sheet showing estate railings, a rendered block wall with steel mesh fence, and timber panel fencing with concrete posts
Tegos Architects, Boundary Treatments, drawing 2605_BOUNDARY_001 (26/61019).
BoundaryBoard condition 5 (2026 permission)This application
Between back gardensBlock walls, 1.8 m, capped and rendered on both sides2 m timber panel fence with concrete posts and gravel boards
Back gardens facing Hawkstown RoadBlock walls, 1.8 m, capped and rendered on both sides2 m black steel mesh fence with evergreen hedging
Walls facing public areasBlock walls, 1.8 m, capped and rendered on both sides2 m block wall, rendered where exposed
Front gardensDetails to be agreed0.9–1.1 m estate railings
Stone from the demolished buildingsProposals to reuse it on boundaries (5(d))Not shown on the boundary drawing

The County Development Plan's own standard allows timber boundaries between gardens if they are supported by concrete posts, so the timber fences are not unusual in themselves. The same standard says boundaries should be solid, with no gaps, and walls facing public areas rendered and capped, which is relevant to the see-through mesh proposed along Hawkstown Road. The main difference is with what the Board required for this site. A compliance submission agrees the details a condition asks for; changing what a condition requires generally needs a new permission, which is one of the things 26/61019 seeks.

On 19 November 2026, two days after lodging this application, the developer also asked the Council, under condition 5 of the existing permission, to agree timber fencing between gardens and steel mesh along Hawkstown Road. Its reasons for the mesh: the gardens sit about 3 to 6 m above the road, behind an existing gabion retaining wall (stone-filled wire cages) that is outside the site and in public ownership; hedging will give privacy; and a mesh fence with hedging is greener, lets in more light and keeps views towards the sea. Its letter adds that it wants the site "made safe in a way that does not generate unnecessary waste".

Sources: Board Order ABP-318978-24, condition 5; 26/61019 cover letter, p.4, Boundary Treatments drawing and Site Layout Plan; Sweetspot Keatingstown Limited, compliance submission on condition 5, 19 November 2026 (file 23/390); CDP Appendix 1, s.3.1.3, as quoted in the ABP inspector's report, pp.14–15.

10Bats and trees

In short: the appeal inspector first recommended refusal because there was no bat survey. A full bat assessment found no roosts on site, only foraging, and the permission was granted with bat mitigation in condition 2. This application's file has no bat or ecology report.

In February 2025 the Board decided it needed information on whether bats used the site and its old buildings. A Bat Fauna Impact Assessment by Altemar Marine and Environmental Consultancy was lodged in June 2025 and completed in September 2025. Condition 2 requires its mitigation measures to be carried out under an ecologist's supervision. Condition 6 requires bat-sensitive lighting, and condition 11 for a tree survey identifying trees that bats could roost in, before any trees are felled.

The 26/61019 file lists 35 documents (checked 28 November 2026). None is an ecology, bat or tree report. The cover letter's only reference to nature is a sentence on Appropriate Assessment, the test for effects on protected European sites, which it says the changes would not affect.

The assessment found no evidence of bats roosting in the buildings and only low-potential trees, but confirmed that three common bat species forage on the site. Because no roost was confirmed, the assessment concluded that no NPWS derogation licence (a licence from the National Parks and Wildlife Service to disturb a protected species) was needed for the works as assessed. Its measures include a check for bats before works start, with a licence needed if any are found. The inspector's addendum found the recommended mitigation adequate.

The new layout changes the house positions, the boundaries and the road. Whether the bat mitigation still fits the new design is a fair question to ask the Council.

Sources: ABP inspector's addendum report (8 December 2025), section 1.0; Board Order conditions 2, 6 and 11; 26/61019 iDocs file list and cover letter, s.8; Council email of 28 August 2026 on file 23/390, which flags condition 11 in relation to site clearance.

11Weighing it up

What the applicant says

  • Sweetspot Keatingstown Limited "recently acquired the lands" and is "eager to commence development".
  • The change is "primarily ... a change of house type with the development remaining at 13 no. houses".
  • "The overall layout is generally the same with some adjustments to the orientation of dwellings and the removal of terraces. The access arrangements and location of open space remains the same as permitted."
  • The principle of development, density, access, parking and open space "remain relatively unchanged" from the parent permission.
  • The engineering design "generally ... follows the original granted scheme".
  • Part V (the rule that a share of new homes goes to social housing): discussions with the Council's Housing Department are ongoing, with final details to be agreed after planning permission.
  • On the Hawkstown Road boundary (in its separate condition 5 letter): the level difference and the existing gabion wall; hedging for privacy; and a softer, greener edge with more daylight, biodiversity and views to the sea.

Source: Simon Clear & Associates, cover letter for 26/61019, 17 November 2026, pp.2–4; Sweetspot Keatingstown Limited, letter of 19 November 2026 on file 23/390. Summarised, with the applicant's own phrases in quotation marks.

Weighing it up Our view

This is a small scheme and a modest change. Still, the permission it changes came after a long, contested appeal, and several of the Board's specific requirements are touched by it.

Points in favour

  • No three-storey terrace on the lower ground by Hawkstown Road
  • Semi-detached homes with parking on each plot, closer in form to the estate next door
  • Bigger four-beds, and more three-beds suited to smaller families
  • The same number of bungalows
  • A developer that says it is ready to build homes that already have permission

Points of concern

  • Four-beds fall from 7 to 2, and three-beds and bungalows get smaller (national policy broadly favours more mid-sized homes as households get smaller, so this cuts both ways)
  • About 97 m² less public open space, while the cover letter calls open space "relatively unchanged"
  • Timber fences between gardens where the Board asked for rendered block walls
  • No bat or ecology report on the file, although bats were the main issue at appeal and the 2025 survey will be about 16 months old by the decision date
  • A see-through mesh fence along Hawkstown Road where the Development Plan asks for solid boundaries

Questions to ask yourself

  1. Does the new mix suit Wicklow town's needs better or worse than the permitted one?
  2. Should the Board's conditions on boundaries and bats carry over to any new permission in full?
  3. Is a smaller open space acceptable if it stays in the same place?

The Council can grant, refuse, ask for further information or attach conditions, for example on boundaries, bat mitigation or the mix of homes. Have your say explains how.

12Loose ends and questions

In short: 13 points where the documents disagree, something seems to be missing, or a question could fairly be put to the Council (as at 28 November 2026).

Show all 13 loose ends
  1. Boundaries and condition 5(a). The Board required 1.8 m rendered block walls to all rear gardens. This application proposes timber panel fences between gardens and steel mesh to Hawkstown Road. The cover letter calls the timber fence "concrete post and rail", and the site layout also has one "1.8 m High Post & Rail Fencing" label. Question: which boundaries would apply if both permissions exist?
  2. No bat or tree report. See section 10. Question: does the Altemar bat mitigation still fit the new layout, lighting and boundaries?
  3. Open space. Given as "9828 sqm", "0.09828 Ha" and "0.9828 Ha", and about 97 m² smaller than permitted. The cover letter says the location of the open space "remains the same as permitted" and that open space is "relatively unchanged"; it does not mention the smaller area.
  4. Site area. 0.55 ha in 2023, 0.5325 ha now. The documents don't say whether the red line (the site boundary on the application maps) has changed.
  5. Part V. The Council's Part V letter on file (21 August 2026) was written for the previous owner's proposal and names "2 x 3 bed 4-person 2 storey type A houses nos. 12 and 13". In the new layout nos. 12 and 13 are a 3-bed for 5 people and a 4-bed. Question: which homes would be social housing?
  6. House no. 7. The Board's condition 3 required a dual-fronted west elevation. The new drawings don't say how this is met.
  7. Figures that don't match. House Type A's bedrooms add up to 45.77 m², as in the Housing Quality Assessment, but its drawing says 40.5 m². Storage is 5.7 m² on the drawing and 6.3 m² in the assessment; for Type B it is 3.75 m² against 6.13 m². The assessment lists one bedroom as 131 m² (13 m² for the identical house next door).
  8. Site clearance. In August 2026 the developer asked about a "demolition and enabling works package", and the Council said site clearance needs no commencement notice. The file doesn't show whether clearance has happened. Conditions 2 and 11 (bats, trees) bear on it.
  9. The notices. The site and newspaper notices describe "a change of house types and design". They don't mention the fall in four-beds, the end of the three-storey terrace, the new boundaries or the smaller open space. Notices are summaries; the drawings hold the detail.
  10. How many three-storey homes? The appeal inspector describes units 7 to 13 as "three storey in scale", while the 2023 development statistics list three of them as three-storey. The difference may come from the sloping ground. Question: how tall are the permitted homes on the lower ground?
  11. Foul drainage. The new engineering report says foul water will "connect to this existing foul water sewer" along Hawkstown Road, "subject to agreement with Uisce Éireann". The appeal inspector described the permitted connection as being at the Keatingstown junction on Broomhall Road. The new report has no statement on sewer capacity, and the Council's referral letters for this application went to the Department of Housing and Irish Rail, not Uisce Éireann. Question: has the connection point changed, and is there capacity, given residents' past concerns about overflows?
  12. The boundary with the estate. The new boundary drawing says "Existing landscaping to remain" on the Hawkstown Road side, but says nothing specific about the boundary wall and screen planting along the estate, which residents asked to keep at appeal. Question: will they be kept?
  13. Construction traffic. The developer is "eager to commence development", and the secondary school is close to the estate entrance. The Construction Management Plan required by Board condition 17 is agreed between the developer and the Council, without a public comment stage. Question: has it been lodged, and how will construction traffic be routed at school times? Residents can ask the Council's planning section.

Sources: 26/61019 cover letter, Site Layout Plan, Housing Quality Assessment, house type drawings (2605 series), Part V letter (Wicklow County Council Housing, 21 August 2026), site and newspaper notices; Board Order conditions 2, 3, 5, 11 and 17; ABP inspector's report paras 7.4.7 and 7.6.2; 26/61019 Engineering Planning Report (POGA), section 2, and boundary drawing 2605_BOUNDARY_001; Council referral letters, 18 November 2026; 23/390 layout schedule (April 2023); correspondence on file 23/390.

13How to have your say

Anyone can make a written observation on a planning application, supporting it, objecting to it, or asking for changes. The Council must take valid observations into account when it decides.

StepWhat to do
1. DeadlineThe Council's register gives 21 December 2026 as the last date for submissions. The Council says observations must be received by 5 pm on the closing date, so a posted letter must arrive by then. Don't leave it to the last day.
2. Fee€20, paid when you lodge it. Without the fee the observation isn't valid. You can pay by card over the phone on 0404 20148.
3. Lodge itOnline through the Local Government Ireland Planning System (register first, then choose "Create a submission"; you can pay there, and only one document can be uploaded); by email to plandev@wicklowcoco.ie (pay the fee by card on 0404 20148); or by post to Planning Department, Wicklow County Council, County Buildings, Wicklow Town.
4. IncludeYour name and address, the reference 26/61019, and your points. Observations become part of the public planning file, with your name, so leave out anything you wouldn't want published.

What makes an observation count

  • Write in your own words. Several individual observations usually carry more weight than identical copies of one letter.
  • Stick to planning matters: the mix of homes, design, boundaries, open space, ecology, access, how the scheme fits the Development Plan and the existing permission. Property values and who the developer is don't count.
  • Be specific, and say what you'd like the Council to do: refuse, ask for more information, or attach conditions.
  • Be accurate. Quote the application's own documents where you can.

What happens next

StageWhat it means
DecisionThe register gives 20 January 2027 as the decision date. The Council can grant permission (usually with conditions), refuse it, or first ask the applicant for further information.
What the Council looks atThis is a new application for permission. The Council assesses the proposed changes; matters settled on appeal, such as the principle of 13 homes here, access and traffic, are unlikely to be reopened. The existing permission stays in place either way, and a developer generally builds one permitted scheme or the other, not parts of each.
Further informationIf the Council asks for more information and the reply is significant, the applicant must publish new notices and the public can comment again. The decision date then moves.
AppealThe applicant, and anyone who made a valid observation, can appeal the decision to An Coimisiún Pleanála (formerly An Bord Pleanála) within 4 weeks of it. A fee applies. In general, without an observation now, there is no right to appeal later.
If it's refusedThe existing permission for 13 homes (23/390, granted on appeal ABP-318978-24) still stands and can still be built, subject to its conditions, until 11 January 2031. A refusal stops the changes, not the scheme.

Sources: Wicklow County Council planning register and its "Planning Objections" guidance (wicklow.ie, checked 28 November 2026); Planning and Development Act 2000 and Planning and Development Regulations 2001, as amended. Check the Council's or the Commission's websites for current fees and time limits before relying on them.

14Questions and answers

Ask anything about the application or this page. Answers are published here in weekly batches, without your name unless you ask for it to be included.

Form not showing? Open it in a new page. Privacy: how your details are used.

Answered so far

No questions answered yet. The first answers will appear here within a week of the page going live.

Corrections

None yet.

Sources and credits

All figures come from documents on Wicklow County Council's planning files: 26/61019 (received 17 November 2026), including the Simon Clear & Associates cover letter, Tegos Architects drawings and Housing Quality Assessment, and the POGA Consulting Engineers report; 26/130 (cover letter and planner's report); and 23/390 (2023 site layout, and correspondence on file from August to November 2026). The parent permission is An Bord Pleanála case ABP-318978-24 (Board Order, inspector's report and addendum report, from pleanala.ie). Drawings are reproduced for comment and review, credited to their authors; the originals are on the Council's ePlanning site. Counts, averages and percentages are polity.ie's own arithmetic from those documents.